| |
| Most Recent Employer: |
Motorola |
| Job Title: |
BSS Engineer |
| Start Month/Year: |
12/2004 |
| End Month/Year: |
Current |
| City: |
Baghdad |
| Country: |
Iraq |
| Description: |
• BSS Motorola (Iraq) Engineer (November 2004 till Know)
1. Hardware and Software Site Installation (BTS, BSC, RXCDR, and PCU):
Installation of BTS, BSC, RXCDR, and PCU and performing the commissioning activities which include the following:
- For BTS take the readings of the VSWR Using the Site Master Instrument then perform the Tx and Rx calibrations.
- Assure the proper performance of the overall site before handing over to the end user (ORASCOM).
- For BSC , RXCDR and PCU sites perform the acceptance commissioning
2. Maintenance Works: for BTS, BSC, RXCDR, and PCU this work includes the following:
- Locate the fault and do the necessary remedies case by case.
- The repair will be carried out either by arranging software or by replacing the faulty hardware and take the suitable action.
3. Transmission: this type of work consisting the following activities,
- Connect BSC site to BTS site (according to the link type).
- Connect BTS site to another BTS site.
- Connect RXCDR to BSC site.
- Connect PCU to BSC.
|
| |
| Most Recent Employer: |
Motorola |
| Job Title: |
BSS Engineer |
| Start Month/Year: |
12/2004 |
| End Month/Year: |
Current |
| City: |
Baghdad |
| Country: |
Iraq |
| Description: |
• BSS Motorola (Iraq) Engineer (November 2004 till Know)
1. Hardware and Software Site Installation (BTS, BSC, RXCDR, and PCU):
Installation of BTS, BSC, RXCDR, and PCU and performing the commissioning activities which include the following:
- For BTS take the readings of the VSWR Using the Site Master Instrument then perform the Tx and Rx calibrations.
- Assure the proper performance of the overall site before handing over to the end user (ORASCOM).
- For BSC , RXCDR and PCU sites perform the acceptance commissioning
2. Maintenance Works: for BTS, BSC, RXCDR, and PCU this work includes the following:
- Locate the fault and do the necessary remedies case by case.
- The repair will be carried out either by arranging software or by replacing the faulty hardware and take the suitable action.
3. Transmission: this type of work consisting the following activities,
- Connect BSC site to BTS site (according to the link type).
- Connect BTS site to another BTS site.
- Connect RXCDR to BSC site.
- Connect PCU to BSC.
|
|