Vinay Prakash,
DS-435, Sector-D, Phone: 0522-2434455
LDA Colony, Knp Road, Mobile: +919739002975
Lucknow-226012, DOB : 1st July 1982
VINAY PRAKASH
Work Summary
An engineer with high profession in Microwave Planning, Transmission Survey (LOS Survey), Installation & Commissioning and NMS of NEC Radio(SDH/PDH), Commissioning of Alcatel STM-1& STM-4 SDH equipments, Motorola CDMA BTS commissioning. 3.5+years experience in field of Mobile communication. Carry on to developing Multi-disciplined team that is focused on maximizing profitability and growth.
Current Profile:
Working in Nokia-Siemens Networks as a Transmission Planning Engineer in Bangalore.
Responsibilities:
• MW Link Survey - Responsible for carrying out LOS Survey for MW Links of New Sites, Fill in Sites, Backbone.
• Ensuring the Transmission design parameters from the field as per issued Link Budget requirements.
• Topographic Map Study for the planning of Long distance MW hops and contour study before finalizing the repeater locations for Long distance MW hops.
• Planning and providing support for the implementation of different protection schemes for MW hops to achieve the maximum uptime of Transmission networks.
• Analysis of path condition using NETACT Planner52_IN and Global Mapper And Deciding Antenna Heights, Frequency, Antenna diameter and Interference Calculation Using the Same.
• Planning and Implementation of NEC NMS Using Net Config Tool and PNMS.
• Prepare a complete report of Radio Design assessment with recommendations per cluster wise
• Identify erroneous implementation of planned 'theoretical' Network Design and Propose recommendations on the Network Design
• Responsible for maintaining transmission site data base and release TX plan for new sites.
• Before/after study and recommendation for modification of network design in order to obtain an optimized design.
• Initiate Purchase Request and follow-up for responses.
• Keeping track of warehouse stock related to SDH implementation.
• Vendor management: Allocating work to vendors, keeping track of their invoices, issuing PR for vendors to Customer, Keeping track of vendor PO.
Previous Experience:
Worked as a Senior Engineer-RAN in Tata Teleservices Limited-Rajasthan (Feb2007-Feb2008) and looked after complete TTSL CDMA Network of Sikar, Jhunjhunu and Churu districts and to ensure maximum uptime of the network.
Responsibilities:
• Operation & Maintenance of BSS.
• Ensure maximum network availability of both fiber and m/w TX network.
• Operation & Maintenance of SDH/PDH Microwave equipments.
• Operation & Maintenance of SDH equipment (Alcatel STM-1, STM-4, STM-16) in optical systems.
• Integration of new network nodes of RAN, Microwave & optical transmission.
• Supervision of O&M of passive infra equipments.
• Handling customer complaints concerned with network coverage.
• BTS up gradation to solve network congestion problem.
• BSNL POI acceptance testing.
Global Tele service Limited (Jaipur): (December 2005 to February 2007)
Roll out of Access and Backbone network of TTSL (TATA Teleservices Limited) in Rajasthan.
• As a supervisor of MW implementation include installation, commissioning and PAT.
• Microwave Frequency Planning (MW link level planning and interference analysis).
• Microwave Transmission SDH Planning – for Backbone 7GHz and 15GHz link.
• Access PDH links connectivity plan (Loops and Spurs)
• Link Engineering calculation using Pathloss4.0
• Conducting Radio Survey’s / Path Engineering for Point to Point & Point to multipoint Links.
• Radio Network & Access Network Design
• Acceptance Testing using BER meter.
• Installation & commissioning of Microwave links.
• Prepare complete site design document to be submitted to customer.
• Documentation verification prepared by subcontractor.
P.S. Erectors Pvt Limited (N. Delhi): (July 2004 to November 2005)
Installation of Huawei 3606 CDMA BTS for HFCL, Punjab.
Commissioning of Huawei 3606 CDMA BTS.
Installation & Commissioning of Nokia Ultrasite BTS for HUTCH, Delhi.
VSWR measurement using BIRD Site master
Technical Qualification:
B. Tech (Electronics & Communication).
From U.P. Technical. University in June-2004.
Equipments & Software’s Worked on:
1) Path loss 4.0
2) Garmin GPS (with software 4.58), Altimeter (Barigo)
3) Nectact Planner, Global Mapper.
4) BER Meter.
5) NEC Software like PNMT, PNMS, Netconfig Tool.
|