| Preview 3g Resume |
|
| Resume Title: |
ELECTRONICS COMMUNICATION ENGINEER |
|
| Contact Information |
| You not able to see this information! |
|
| Work Experience |
| Experience level: |
5-10 years |
| Profile/Cover Letter: |
SKILLS
Computer Literate
• MS Office, Auto CAD, Adobe Acrobat
• Driving with valid Philippine Driver License
• Knowledge in Equipment Installation
ALCATEL- BTS EVOLIUM, Rectifier , DDF, Transmission
(indoor and outdoor unit ), Battery Backup Unit (BBU)
NOKIA- Metrosite, Ultrasite, Flexihopper
NORTEL- Remote Line Concentrating Module (RLCM)
NERA- Compactlink (indoor and outdoor Unit)
• Knowledge in Testing Equipment
Anritsu Site Master (VSWR, Return Loss, Distance to Fault)
Bird Power Meter
Transmission Inpairment Measuring System
Garmin Global Positioning System (GPS)
Chaurvin Arnoux Grounding Tester
• Testing and Commissioning
Coaxial Cable
Outside Plant FSF Copper Cable
|
| |
| Most Recent Employer: |
TRISILCO-FOLEC PHILIPPINES Inc. |
| Job Title: |
Senior Engineer |
| Start Month/Year: |
08/2006 |
| End Month/Year: |
Current |
| City: |
Makati City, Philippines |
| Country: |
Philippines |
| Description: |
Responsibilities:
• Supervise, organize, maintain and administer the job site activities(Telecom, Electrical and Civil works) to ensure that work is in accordance with the approved schedules, set standards and specifications and within the budget.
• Currently handle Suncellular IBS roll-out.
• Conduct commissioning, test call and site Integration of Node B 3G, coordinate with RNC.
• conduct the site survey planning and design for the In-Building Solution Project together with t |
| |
| Most Recent Employer: |
ETSI Technologies Inc. (Siemens Joint Venture) |
| Job Title: |
Senior Engineer/Project Manager |
| Start Month/Year: |
01/2006 |
| End Month/Year: |
08/2006 |
| City: |
Cainta, City Philippines |
| Country: |
Philippines |
| Description: |
Responsibilities:
• Supervise, organize, maintain and administer the job site activities to ensure that work is in accordance with the approved schedules, set standards and specifications and within the budget.
• Manage the general coordination and scheduling of works by setting up lines of authority and communications. Ensure that work progress is in accordance with the approved CPM milestones and other networks. Initiate and lead the Planning and programming with the objective of k |
| |
| Most Recent Employer: |
Aurotech Systems (Phils) Inc. |
| Job Title: |
Project Manager |
| Start Month/Year: |
01/2005 |
| End Month/Year: |
12/2005 |
| City: |
ALABANG CITY |
| Country: |
Philippines |
| Description: |
Responsibilities :
• Conduct project/site inspection to ensure that the works done are based on standard requirements and specification of the client.
• Review and discuss with the management any proposed changes on the system and procedures to improve company‘s operation.
• Prepares the Acceptance Checklist and Performs testing and commissioning of equipment and alarms prior to Pre-acceptance Test.
• Prepares a Cost Estimate to ensure the project profitability
• Prepares Project milestone or construction timeline schedule (MS Project) prior to mobilization (Project Road Map)
• Monitor the project status and conduct a weekly meeting with site engineer for issues and concern.
• Prepares all necessary documents for billing purposes.
• Check and review the technical proposal and site survey report prior to submission.
• Responsible for research and study the existing project that has potentials for expansion.
• Attends monthly meeting with the department managers regarding updates, issues and concerns.
|
| |
| Most Recent Employer: |
Fabriquem Integrated Resources, Inc. |
| Job Title: |
Technical Manager |
| Start Month/Year: |
06/2002 |
| End Month/Year: |
01/2005 |
| City: |
MAKATI CITY |
| Country: |
Philippines |
| Description: |
Responsibilities :
• Reviews and Approved (Signed and Sealed) the as-built plan then submit to the Project Management.
• Supervises the staff (numbering 10) assigned in the “Technical” Team [* currently working on a BTS and TRANSMISSION Installation Project]
• Conduct project/site inspection to ensure that the works done are based on standard requirements and specification of the client.
• Prepares the Bill of Quantity(BOQ)for billing and Bill of Materials ( BOM) for purchasing purposes
• Prepares/submit a week/status report to the President.
• Occasionally attends meeting with the client together with the Marketing Department in cases where technical expertise is required.
• Responsible for research and study the existing project that has potentials for expansion.
• Prepares the Acceptance Checklist and Performs testing and commissioning of equipment and alarms prior to Pre-acceptance Test.
• Occasionally attends technical training given by the client, manufacturer, suppliers.
• Reviews and discuss with the management any proposed changes on the system and procedures to improve company ‘s operation.
• Attends monthly meeting with the department managers regarding updates, issues and concerns.
• Evaluate and recommends training, program necessary the improvement of the capabilities of the personnel.
|
| |
| Most Recent Employer: |
Pagecom Inc. |
| Job Title: |
Project Engineer |
| Start Month/Year: |
08/1997 |
| End Month/Year: |
06/1999 |
| City: |
Pagecom Inc. |
| Country: |
Philippines |
| Description: |
Responsibilities :
• Responsible for the smooth flow of the assigned project.
• Oversees and monitors the status of the project.
• Responsible for the preparation of Physical accomplishment then submit to the operation manager for billing purposes.
• Responsible for imposing the proper safety measures within and outside installation works.
• Request tools/equipment and material to be used.
• Prepared project scheduling/budget requisition and liquidation.
• Attends coordination meeting with the client.
• Perform Quality Survey for billing purposes.
• Prepare Daily Time Record (DTR) of manpower.
• Perform material inventory/reconciliation.
• Prepare Site Instruction (S.I.), red line drawing and as-built Plan.
• Acquisition of Right of Way (R.O.W) Permit.
|
|
|
| Background and Experience |
| |
| Education Level: |
Bachelor's Degree |
| School Name: |
University of The East |
| Major: |
Electronics Communication Engineer |
| City: |
Caloocan |
| Country: |
Philippines |
| Graduation Date: |
26/03/1996 |
| Description: |
Eligibility : Passed the Electronics & Communications Engineering Licensure Examination given last Nov. 4&5, 1996 by the Board of ECE, Professional Regulation Commission with License No. 14005 |
|
|
| Languages |
| Language |
Level |
| |
| English |
Fluent |
|
|
| Job Preferences |
| Job Category: |
Satellite Communication |
| Job Type: |
Full-Time Employee |
| Job Status: |
Flexible |
| Desired Salary: |
$0 Unspecified |
| Desired Location: |
Wisconsin |
| Willing to Relocate: |
Yes |
|
|
Print
|
| |
|