SUB : APPLICATION FOR THE POST OF TRANSMISSION ENGINEER/ENGINEER OR ANY SUITABLE POSITION
It gives me great pleasure to submit my application for the above mentioned post if there is any vacancy.
For your information, I obtained a Diploma in Information Technology from Binary Business School Kuala Lumpur in 1995 and Certificate in Electrical Industrial and Domestic from City College of Technology Kuala Lumpur in 1991. I acquired my experience in Computer Hardware, Implementation, Testing and Commissioning for SDH and PDH Transmission System (Nokia), Testing and Commissioning for Microwave and System (Nokia and Alcatel), CME (Civil, Mechanical & Electrical), Documentation preparation for Site Survey checklist procedure, Testing and Commissioning, Installation and Implementation, Project Coordination with subcontractor and Vendor and Good Knowledge with Material requisition and tools preparation. I am working with Sapura Transmission Sdn. Bhd. since December 1991 until May 2006 and Data Efektif Sdn. Bhd. since June 2006 until now.
Attached herewith please and experience in project environment, I would welcome the opportunity for a personal interview at your convenience to further discuss the opportunity to serve your esteemed organization.
Sincerely
Azlan Abdulah
|
| |
| Most Recent Employer: |
Data Efektif Sdn. Bhd. |
| Job Title: |
Project Coordinator/Network Engineer |
| Start Month/Year: |
06/2006 |
| End Month/Year: |
Current |
| City: |
Kuala Lumpur |
| Country: |
Malaysia |
| Description: |
1.Company Name :Data Efektif Sdn. Bhd.
Position Title :
Project Coordinator / Network Engineer
Position Level :
E2
Specialization :
Implementation/Testing/Commissioning/Site Survey/Logistic and Coordinator
Industry :
Telecommunication / Information Communication Technology (Hardware & Integration)
Date Joined :
June 2006 Date Left :
until now
Work Description :
WiMax Site Survey
•Involved site survey for Packet One and Alcatel-Lucent.
•Involved and Site Preparation Proposal for new WiMax site location.
Preventive and Corrective Maintenance Nokia Flexihopper Micro Wave for Celcom 3G for 1st phase and 2nd Phase at Johor Region.
•Involved as Project Manager and Troubleshooting Nokia Flexihopper Micro Wave - < 400 sites.
•Liaise with Celcom and Nokia for updated Preventive and Corrective Maintenance.
•Monitoring replacement of faulty unit and Stock balance with documentation and Data Tracking.
Government Integrated Radio Network – GIRN (SAPURA)
•Involved pre site survey Selangor and Klang valley area
•Preparation site survey report for Government Integrated Radio Network - GIRN
MICROWAVE TRANSMISSION – CELCOM 2nd Phase Nokia Mini Link
•Involved in installation and commissioning mini link Nokia FlexiHopper 1+1 13GHz, 18GHz
•Involved site survey for mini link Nokia FlexiHopper.
•Involved and site preparation proposal for CME 3G site location.
•Involve with 160 sites mini link Klang valley area
•Performed site survey & site supervision.
•Coordinate with Subcon, Nokia, Celcom for new site survey and installation mini link.
•Meeting with Nokia, Celcom for updating site progress.
MICROWAVE TRANSMISSION – CELCOM 2nd Phase Alcatel Swap
•Involved site survey for Swap Nokia to Alcate BTS including HOT Swap
•Involved and site preparation proposal for CME 3G site location.
•Involve with 160 site Klang valley area
•Performed site survey & site supervision.
•Coordinate with subcon, nokia, celcom for new site survey and installation new mini link.
•Meeting with Nokia, Celcom for updating site progress.
Operasi Latihan Tentera (OPLAT)
•Involved with Dansyia for designing Network and power cable routing for Bilik Operasi Latihan Tentera
•Involved and site preparation proposal for CME
•Performed site survey & site supervision.
Majlis Perbandaran Pulau Pinang (MPPP)
•Involved with Ramtronic for Tender Membekal, Memasang, Menguji, Mentauliah dan Menyelenggara Sistem Pemantauan Kamera Tanpa Wayar 4.9 Ghz in Majlis Perbandaran Pulau Pinang
|
| |
| Most Recent Employer: |
Sapura Technology Berhad |
| Job Title: |
Network Engineer |
| Start Month/Year: |
01/2003 |
| End Month/Year: |
05/2006 |
| City: |
Kuala Lumpur |
| Country: |
Malaysia |
| Description: |
KTMB RAWANG – IPOH DOUBLE TRACK
Involved with :
•Involved in installation and commissioning PDH and SDH (STM1) – Nokia Multiplexer
•Installation of Network Management System (NMS) -Nokia
•Rectifier installation, troubleshooting, testing & commissioning(SWICHTEC).
•Performed site survey & site supervision.
•To prepare BOQ for KTMB & Arytomen Consortium.
•To prepare additional project forcas and future planned (extension of time) for KSO Opus
•To coordinate & handle changes in project that could impact deliveries/process during project stage
•Report progress against the plan, resolve and report any issues that arise within PMIS (Artemis System)
•To coordinate, manage & follow-up the project team and all activities of cross functional resources in delivering project objectives effectively using appropriate methodologies and techniques that are within the project management life cycle and governance framework.
MICROWAVE – TALISMAN PROJECT.
Involved with :
•Involved in troubleshooting interfacing VSAT Link from City Bank building to offshore (bunga raya A - eastern) – Alcatel Multiplexer.
KTMB IPOH RELOCATION – DRB PROJECT
•Involved interfacing and monitoring PABX, Transmission (KTMB DTS) and IT System.
•Supervised CME Contractor.
•Coordinate with contractor and KTMB for work progress
3G WCDMA AND MICROWAVE TRANSMISSION – TELEKOM MALAYSIA / CELCOM
•Involved in installation and commissioning Nokia Node B (BTS) WCDMA 3G for Telekom Malaysia (Supreme and Optima)
•Installation including CME, antenna system and rectifier system for WCDMA BTS indoor and outdoor works.
•Involved in installation and commissioning mini link Nokia Flexi Hopper.
•Involved site survey for Nokia Node B (BTS) 3G and mini link Nokia Flexi Hopper.
•Involved and site preparation proposal for CME 3G site location.
•Performed site survey & site supervision.
|
| |
| Most Recent Employer: |
Sapura Transmission Sdn Bhd |
| Job Title: |
Technical Executive |
| Start Month/Year: |
01/1999 |
| End Month/Year: |
01/2008 |
| City: |
Kuala Lumpur |
| Country: |
Malaysia |
| Description: |
KMTB DIGITAL TRANSMISSION SYSTEM (DTS) – COMMUNICATION NETWORK (MALAYSIAN WIDE)
Involved with :
•Involved in installation and commissioning of PDH and SDH Equipment (STM1) – Nokia Multiplexer
•Installation of Nokia Network Management System (NMS) - Nokia
•Performed site survey for KTMB Station.
•Single Earthing System – responsible for Earthing system, design and implementation.
•Rectifier testing, commissioning and troubleshooting (ASCOM), battery commissioning.
•Performed site supervision for CME work.
•Involved in upgrading data system 64kbs and 2mbs for KTMB IT – Malaysian WIDE
•Involved with preliminary design, clarification meeting on technical issues.
|
| |
| Most Recent Employer: |
Sapura Energy (subsidiary of Sapura Holdings) |
| Job Title: |
Senior Technician |
| Start Month/Year: |
01/1998 |
| End Month/Year: |
01/1999 |
| City: |
Kuala Lumpur |
| Country: |
Malaysia |
| Description: |
PETRONAS RETAIL AUTOMATION SYSTEM - POINT OF SALE
Involved with :
•Involved in installation, troubleshooting, cabling, commissioning pc hardware and software in Petronas station (petrol pump).
•Performed logistic purchasing.
|
| |
| Most Recent Employer: |
Uniphone Fibre Optic Sdn. Bhd. |
| Job Title: |
Senior Technician |
| Start Month/Year: |
01/1995 |
| End Month/Year: |
01/1997 |
| City: |
Kuala Lumpur |
| Country: |
Malaysia |
| Description: |
ADAM (PCN) NETWORK PROJECT
Involved with :
•Installation of Base Transceiver Station (BTS) including antenna system & Base Station Controller (BSC) of Nokia & Motorola.
•Installation of microwave link 15 GHz, 18GHz of Nokia, Prime Site, DMC & DMC Spectrum II (7GHZ, 14GHz, 18GHz & 23GHz).
•Installation of Prime Site and Remote Head for Indoor Coverage
•Installation of Outdoor Base Transceiver Station.
•Testing and commissioning of BTS and microwave link.
•Microwave link troubleshooting
•Sweep/VSWR testing - checking performance of antenna feeder using network analyzer & power meter
•Installation of tower mounted amplifier (increasing signal coverage).
•BTS, rectifier, battery & microwave link upgrading work
•BER testing
•Rectifier testing, commissioning & troubleshooting (ASCOM, CHLORIDE, HAWKER), battery commissioning.
•Do patching for 2Mbits Microwave link
•Performed site survey & site supervision
EDARAN TELECOMMUNICATION SDN. BHD.
Involved with :
•Involved in Installation of Siemens Equipment. (Fiber Optic) in RBS (Radio Base Station) Celcom.
- Synchronous Multiplexer (SMA4 R2 & SMA16 R2)
- Synchronous Line Regenerator (SLR 16 & SLR 16E)
- Synchronous Add/Drop Line Multiplexer (SLD 16 & SLD16E)
|
| |
| Most Recent Employer: |
Uniphone Fibre Optic Sdn. Bhd. |
| Job Title: |
Senior Technician |
| Start Month/Year: |
12/1991 |
| End Month/Year: |
12/1994 |
| City: |
Kuala Lumpur |
| Country: |
Malaysia |
| Description: |
Tenaga Malaysia Berhad (TNB Project)
Involved with :
•Involved in installation, troubleshooting, cabling and commissioning Nokia Transmission Equipment. (PDH System)
•Performed site survey in TNB Substation & site supervision.
•Performed logistic purchasing.
Telekom Malaysia Berhad (TMB Project)
Involved with :
•Involved in installation, troubleshooting, cabling of OLTE (Optical Line Terminal Equipment) – Fujitsu 8Mb, 34Mb, 140Mb & 565Mb.
•Involved in installation,troubleshooting, cabling of DLC (Digital Loop Career) – Fujitsu.
•Involved in installation,troubleshooting, cabling of CSV (Centralized Supervisory) – Fujitsu.
•Involved in
installation,troubleshooting, cabling of SDH (Synchronous Digital Hierarchy) – Fujitsu.
•Performed site survey in Telekom Exchange & site supervision.
|
|
|
| Background and Experience |
| |
| Education Level: |
Associates |
| School Name: |
Binary Business School |
| Major: |
Information of Technology |
| City: |
Kuala Lumpur |
| Country: |
Malaysia |
| Graduation Date: |
18/12/2000 |
| Description: |
Binary Business School
Diploma Information of Technolgy |
| |
| Education Level: |
Associates |
| School Name: |
City College of Technology |
| Major: |
Electrical Domestic & Industrial |
| City: |
Kuala Lumpur |
| Country: |
Malaysia |
| Graduation Date: |
01/12/1991 |
| Description: |
Certificate Eletrical Domestic & Industrial (Basic & Intermidiate) |
|
|
| Languages |
| Language |
Level |
| |
| English |
Intermediate |
|
|
| Job Preferences |
| Job Category: |
RF Engineer |
| Job Type: |
Any |
| Job Status: |
Flexible |
| Desired Salary: |
$2000 a month |
| Desired Location: |
Malaysia |
| Willing to Relocate: |
Yes |
|
|
Print
|
| |
|