I would like to introduce myself as Saurabh singh Diploma holder in Electrical And Electronics Engineering(pursuing B-tech) having 7.8 years of Telecom experience In Project Management Service Delivery,implimentation of sites,Installation,Commissioning O
Contact Information
Please log in to see contact information!
CURRICULUM VITAE
SAURABH SINGH
Mobile +91-9582907116,+91-9911159093
Email saurabhgtl@gmail.com
Career Objectives - To be quality Leading & Efficient Telecom Specialist in today's growing Industry and to be an efficient Telecom Professional equipped with skills to work in team, lead & manage team work. A competent professional with lead role with 7.8 years of experience in Project Management Service Delivery,implimentation of sites,Installation,Commissioning,LOSsurvey,RF survey,W-max survey,Technical Support / Support
1. Skilled in swiftly ramping up projects with competent skills and ensuring on time deliverables.
2. Sound knowledge of installation, integration and commissioning of BTS and transmission equipments.
3. Expose of Managing large Turnkey and Swap projects for Government and private operators.
4. Supervised the support, installation and commissioning of GSM/SDH/Power system.
Abstract Currently working with AIRcom ind pvt ltd as a project coordinator.Las project with IGTL Oman (Muscat) as Project Cordinator (Team lead) through Global Innovo source search solution pvt ltd.(A division GTL group)from 5Sep 2007 to 15 sep 2011.
Microwave (Ericsson)
Installation, commissioning and fault testing of MINILINK Traffic Nodes (2P, 2Pb, 6P, 6PB, 6PC, 20P, 20Pb).
Working knowledge of NPU8x2, NPU 1B, NPU2, NPU3,NPU3B, Worked on R2 ,R3and R4.3.1,R4.3.2 TN release with MMU2, MMU2B, MMU2C, MMU2D,ETU3,ETU2B, LTU155e/o and LTU12x1,LTU 3 12x1,LTU 16x2
Installation, commissioning and fault testing of MINILINK HIGH-CAPACITY.
Capacity up-gradation and swapping of transmission equipments
Software up gradation of Traffic Node up to Baseline R19A08
Ethernet configuration ( Ethernet bridge, VLAN)
Ethernet traffic over E1
Ethernet traffic over Packet link
VLAN configuration for packet based 3G RBS.
Ethernet/VLAN switching configuration.
Installation and alignment of Ericsson microwave link .3m ,.6m ,1.2m , 1.8m , 2.4m , 3m.
Experience of Active Repeaters sites and Passive Repeater site including Helicopter sites.
Having experience of alignment of Space diversity antenna for 15Ghz and 7Ghz.
Trouble shooting of fault related to transmission.
making the link protection.
Survey of sites and planning
Inspection of contractor work
ASSIGNMENTS
Since sep 09 Senior Engineer TI GTL, MUSCAT (OMAN)
NAWRAS ERICSSON PROJECT Integration & Commissioning (ericsson) BTS and transmission Sites.
1 Commissioning & testing of BTS & Transmission Equipments.
2 Work Experience in Ericsson RBS 2216, 2206, 2111, 2308.2207
3 Work Experience in Ericsson MiniLink E, MiniLink TN, MiniLink Craft 2.3,2.4
4 Troubleshooting the problem arising in the Network.
5 Commissioning and Integration of MMUs, Traffic Nodes(2P,6P,20P)
6 Acceptance Testing (AT) for BTS with Customer for handover.
7 Defining alarms (External), measuring various parameters related with the RBS.
8 Have done New Sites, Expansions, RBS Swapping, IBS sites and Site shifting.
9 Diagnosing the operation, maintenance and technical faults in RBS and TX equipment
PREVIOUS ASSIGNMENT
Jan08 jul 09 Senior Site Engineer GTL, MUSCAT (OMAN)
Projects Undertaken
OMAN MOBILE MUSCAT Integration & Commissioning Transmission Sites.
1 Installation, commissioning and fault testing of MINILINK Traffic nodes (2p, 2pb, 6p, 6pb,6pc,20p,20pb).
2 Working knowledge of NPU 8x2,NPU 1B,NPU2,NPU3,NPU3B.
3 Worked on R2,R3 and R4.3.1,R4.3.2 TN release with MMU2, MMU2C,MMU2D,ETU3,ETU2B,LTU155e/0 and LTU12x1,LTU3 12x1,LTU 16x2.
4 Installation and commissioning and fault testing of ML.
5 Capacity up-gradation and swapping of transmission equipments.
6 Software Up-gradation of traffic nodes up to base line R19A08.
7 Ethernet configuration (Ethernet Bridge).
8 Ethernet traffic over E1.
9 Ethernet configuration for 3G RBS.
10 Plan, control and follow up the O&M of the Project and Support after acceptance by customer.
11 Support and assist implementation and logistics staff to take action for HARDWARE material, which is short-supplied, wrongly supplied, damaged material or any such non-conformance noticed during supply and implementation process.
12 Health Check up of all the sites and BSC.
13 Coordination of site activities, mile stone by milestone.
14 Material monitoring and tracking on the sites.
15 Contractor supervision on the site for all milestones.
16 Resources deployment and management on all sites deployed.
17 Community issue management on all sites deployed.
18 Report tracking of all activities on all sites.
19 Report writing and communication on daily/weekly status.
20 Supervise all sites until handover to client within designated/stipulated time line.
21 To continuously develop ideas which add value to the business units, thus increasing its net worth
22 Make significant contributions to company direction and ultimate success of the organization.
23 Maintain a close working relationship with all key customers both internally and externally.
To carry out all other duties related to the Transmission Department as delegated by your superior officers.
Oct03 Aug07 Implementation Engineer (External) nutek ind ltd.
Projects Undertaken
BSNL, Haryana - As Project Engineer, Transmission.
24 Plan, control and follow up the implementation of the Project.
25 Used MINI-LINK High-Cap for dropping E1s at various sites.
26 Done configuration and commissioning of MINI-LINK Traffic node 6P
27 Done configuration and commissioning of MINI-LINK High-Cap (STM-1).
28 Implemented High- cap as ring topology and chain topology.
29 Done traffic management on DXX (Digital cross connection) Tellabs 6345 unit.
30 Implemented Traffic node as ring topology using 1+1 SNCP protection( Sub Network Control Protocol)
31 Worked on MINI-LINK Manager. MINI-LINK Manager is a management tool for centralized supervision, operation and maintenance of MINI-LINK networks, which can consist of point-to-point and point-to-multipoint equipment.
Idea, Rajasthan - As Project Engineer, BTS Implementation.
32 Done BTS integration (RBS2204, RBS2206).
33 Done BTS Expansion form 2+2+2 to 6+6+6 in combination of 2202 2206 and 22062204.
34 Return Loss Measurements using VSWR Tester or Site Master.
35 Responsible for Quality Assurance for BTS and Microwave Sites
36 Up gradation of PDH from 4x2 to 16x2 on live network.
37 Up gradation of Traffic node from LTU 16x2(Electrical) to LTU 155E/0(Optical).
38 Up gradation of transmission system from Traffic node to MINI-LINK High cap.
39 Commissioning of 15/22, 15/23, 15/24, 7/11, 7/15GHz Microwave equipments for PCM links with 1+0 and 1+1 configuration (with diversity and power splitter)
40 Commissioning of Microwave Modem Unit like 4x2, 34+2, 2x2- 34+2 (capacity analyze)
41 Installation of EDGE hardware and upgrade configuration for Ericsson BTS 2206.
MTNL,New Delhi As Project Engineer, BTS Implementation.
1 Project Title - MTNL MOTOROLA GSM (NEW DELHI)
2 Technology - MOTOROLA-H2
3 Description - Site preparation, Base Site Structure, Site requirements, Site Access, Site Layout, Cabling of power and alarm, VSWR Testing.
1 Project Title - TTSL MOTOROLA CDMA Installation PANJAB,JAIPUR and KOLKATA.
2 Technology - MOTOROLA CDMA(4812).
3 Description - Installation of CDMA BTS,GPS and POWER PLANT,BB, VSWR Testing.
4 Project Title -BSNL HUAWEI BROADBAND NIB-2 PROJECT 2.2(EAST, WEST UP and UTTARANCHAL)
5 Technology -HUAWEI BROADBAND SWITCH.
6 Description -Leads team for installation and commissioning broadband switches (DSLAM).Carryout the survey of BSNL exchange and non-exchange sites for broadband switches.Instollation of switches (DSLAM), DDF, Power plant, MDF.
7 Project Title -HUTCH NOKIA GSM (BARELY and KOLKATA)
8 Technology -NOKIA ULTRA SITE EDGE BTS.
9 Description - Site preparation, Base Site Structure, Site requirements, Site Access, Site Layout installation of BTS M/W(FIU and RRI) and FIU rack.Commissining of BTS and M/w.Call testing of sites. AT of BTS and M/W.Co-ordination with the team in installing indoor electrical equipment and outdoor tower works
b
10 Project Title - ZTE CDME Installation PANJAB(RTL)
11 Technology - ZTE CDMA
12 Description - Installation of CDMA BTS, GPS and Power Termination.
13 Project Title - HUAWEI GSM Installation NEPAL(NTC)
14 Technology - HUAWEI GSM (3012)
15 Description - VSWR Testing, Call Testing, AT & Integration of GSM BTS, Installation of GSM BTS,MSC,BSC Site layout, Alarm &PCM cabling, done swapping of sites,. Power termination of SMPS ,Checking of external alarms through OMCR,
TECHNICAL PREVIEW
Ericsson Equipments
o Formation of Protection Mechanisms,1+1 Radio Protection,MSP1+1,1+1 E1 SNCP, Ring protection, Redundancy.
o BTS Commissioned- RBS (2202, 2106, 2104, 2204, 2204V2, 2204V3, 2206, 2106i, 2964, 2954, 2111) Used OMT.
o Cascading- Distribute the E1 in BTS.
o Commission Mini-Link- High Capacity SDH Hops for STM-1 Transmission.
o Configured of Mini-link E and Mini-link Traffic Nodes (2P, 6P and 20P).
o Routing the E1 for new BTS sites and checking loop back from OMCR.
o E1 Throw - Used D4 connectors and E1s connectors.
o Alarms Testing-Generated in the Cell Site using EAC state and coordination of NOC/OMC.
Nokia Equipments
o BTS Commissioned flexi (indoor & outdoor), Metro BTS (tower mounted) and Ultra BTS (Indoor & Outdoor).
o Throw PCM by E1 card, RRI, (Radio Relay Interface) card, FIU, (Frequency Interface Unit).
o RRI card Commissioned and cross connection to Link Alignment and by passes E1.
o FIU Commissioned for link alignment and by passes E1 and cross connection.
o Routing the E1 for new BTS sites and checking loop back from OMCR.
o Carrier up gradation from two carrier site to a three carrier site, Fourth carrier up gradation.
o Cross Connection-FIU, RRI, E1/T1 cards.
o Transceivers loop test-Testing TRX using BTS manager.
o Alignment- Nokia micro wave antenna hops (1.8m, 1.2m, 0.6m, and 0.3m).
o Installation & Expansion-BTS and Battery bank.
o Alarms Testing-Generated in the Cell Site using EAC state and coordination of NOC/OMC.
Installation, Expansion & Alignment
o Nokia Equipments-Metro hub and Ultra indoor & outdoor BTS, FIU, RRI, E1/T1 (IDU). Flexi EDGE and MW antenna installation (ODU), etc.
o Ericsson Equipments- RBS 2202, 2204, 2106i, mini link E, TN and Hi-Cap (IDU) and MW antenna installation (ODU), etc.
o Alignment of ODU Nokia-(1.8m, 1.2m, 0.6m, 0.3m) mw antenna, Ericsson-(1.2m, 0.6m, 0.3m)mw antenna and Siemens-(0.6m, 0.3m) mw antenna.
Equipments & Softwares
o VSWR, Return loss, DTF, Power measuring by Bird and Anritsu Site Masters.
o Java applet for traffic node (Mini link TN) and mini link high capacity (ML-HC) used for implementing SDH ring and chain topology with E1 Mapping and dropping.
o WINFIOL used for monitoring for sites status and RBSC.
o OMT (Operation and Maintenance Terminal 28_2, 30_4, 32_6, 33_6) for BTS commissioning and trouble shooting
o Ericsson software MSM ((6.0, 6.4, 6.5) for M/W Commissioning, trouble shooting and E1 Dropping.
o PNMT, PNMT neo for M/W commissioning, trouble shooting and E1 Dropping.
o Nokia BTS manager and flexi hub manager for FIFA and RRI manager.
o Nokia hopper manager for transmission equipment FIU.
o Nokia software BTS manager for ultra BTS (4.0, 6.0) and Nokia flexi BTS manager for flexi BTS.
o Ericsson software AXX craft terminal (2.0, 3.0, and 4.0) and DXX Craft Terminal for commissioning of AXX/DXX, Electrical E1 dropping and trouble shooting.
o Mini-link PTP high capacity tool.
o Microsoft Excel, Word and Power Point, Auto Cad and Internet.
AREAS OF EXPOSURE
Project Management / Site Management
1 Evaluating project cost / benefits analysis at project decision points.
2 Finalizing requirements and specifications in consultation with Operators collaborators / promoters.
3 Participating in project review meetings for evaluating project progress.
4 Establishment of project implementation methods and procedures including network resource allocations.
5 Monitoring the Project to meet the committed Timelines.
Infrastructure overview
Checking of layout of Tower, DG , Shelter
Supervision of Tower Foundation.
Checking tower erection as per drawing and proper Torque of bolts.
Supervision of Shelter Erection.
DG installation and commissioning.
Electrical Grounding.
Alarm termination and testing of alarms.
Operations and Maintenance/ Technical Support
Planning and affecting the preventive maintenance schedules of various telecom equipments to increase equipment reliability.
Providing technical support / training to team clients for resolving critical technical issues.
Submitting field technical complaints
Identifying performance bottlenecks and taking adequate measures to rectify faults.
Installation and Commissioning
Prepared layouts for the Wireless, Wire line.
Foreseeing performance bottlenecks and taking corrective measures to avoid the same.
Managed the installation, transmission & commissioning of telecom products and services including MUX, Micro Wave antenna.
Installation and Commissioning of BTS and RF Antenna System with desired Quality.
EDUCATIONAL CREDENTIALS
Pursuing B-Tech in (Electronics and Communication Engg)
RVD University, New Delhi.
Diploma in (Electrical & Electronics Engg)
BSF Institute of Technical Education, Bangalore (Karnataka)
Higher Secondary School
C.B.S.E Board, BSF School (W.B.)
PERSONAL VITAE
Fathers Name Mr. JASPAL SINGH RAWAT
Date of Birth 18th April, 1983
Marital Status Merried
Passport No E4152355
Languages Known English, Hindi.
Permanent Address B8/1A shyam vihar phase -2 Near Goyala dairy more Najafgarh-43
South Delhi(INDIA)
Date
Place (SAURABH SINGH)
Employer:
IGTL
Job Title:
Traffic node Engg transmisson
Start Month/Year:
09/2011
End Month/Year:
Current
City:
delhi
Country:
India
Description:
Project Management Service Delivery,implimentation of sites,Installation,Commissioning Of MW,SDH,PDH,LOSsurvey,RF survey,W-max survey,Technical Support / Support For Government and private organizationS. Presently working as a Protect coordinator in Aircom India Ltd for 2G,3G,w-max Projects.I would like to pursue a challenging career and reach new heights thereby improving my own life standards and of the company, I work for.I have 3.5 years of telecom experience in Oman(Muscat) and 5 month in Nepal(Kathmandu).