|
Nov 2010 Oct 2011, ERICSSON Indonesia
3G RF Consultant
July 2011 Oct 2011, Modernization and 2nd Carrier, INDOSAT Project RO 2011
Mar 2011 Jun 2011, AXIS Project, Jabo RO 2010
Nov 2010 Feb 2011, New Site and Modernization, INDOSAT Project, Jabo RO 2010
Tuning and Optimisation, new site, swap site, existing site, RBS3000, RBS6000, 2nd Carrier RAN P7, W10
Monitor KPI Statistic (PMR) CS CSSR, CS CDR, PS CSSR, PS CDR, SHO, IRAT, IFHO
Create CR_Parameter to improve KPI, check alarm
Processing log file Drive Test (TEMS), analyse layer 3 messages
Create and submit Quality Acceptance Certificate after achived KPI target (OSS Basic KPI and DT Cluster)
Tools Moshell, MCOM, KPI Monitor Statistic, TEMS , RFO, ITK, WNCS
Jun 2010 October 2010, NSN Indonesia, TELKOMSEL Project
3G RF Consultant
Bali Telkomsel Manage Service Project, NSN RAN RU10, Flexy BTS
Bandung Telkomsel Roll Out Project (PLO Engineer)
Monitor KPI Statistic RRC, CSSR CS, CSSR PS, CCSR CS, CCSR PS, SHO, ISHO, HSDPA Accessbility, HSDPA Retainibility
Tools Nemo, KPI Monitor Statistic, PlanChecker, Mipt3G
Nov 2009 April 2010, UCE (RF Consultant Company) Jakarta, Indonesia
3G RNO Consultant, Cluster Owner
Hutchison Project, 3G swap from NSN to Huawei, Jakarta
Improve/maintain KPI after swap
Actix/TEMS DT log analysis ( Call Drop, Pilot Pollution, Missing Neighbour, Swap Feeder, RSCP, EcIo, SC, BLER, SIR, UE TxPWR, RTWP, Antenna Config)
Cluster report before and after swap base processing log file CS (Voice, Video, PS) RSCP, EcIo, SC, Throughput, Major KPI
Submit CR to change parameter, activate HSDPA, Add neighbour
SSV Report after site on air, CAC Cluster Report before and after swap
Monitor KPI Statistic RRC, CDR, SHO, HHO, UL/DL Throughput, CE and Power Congestion, RTWP, Zero Traffic, Admission Control, IRAT HO, Failure Counter
Tools M2000 and LMT, MapInfo, MML data
Handling VIP Customer Complaint,
May 2009 Oct 2009 HUAWEI OMAN, 3G Oman Mobile MS Project
3G RNO Consultant, Cluster Owner
3g Cluster Optimisation, 3G Oman Mobile Project, Muscat and Salalah area
GENEX Probe 1.52, log file, drive test
GENEX Assistant 1.52 Analyse log file, create Change Request
Perform Drive Test Report/Presentation after Change Request
Rigging, Azimuth, Tilting, Neighbour, PCPICHPOWER, IRAT, Direct Retry, Power Admission, Pilot Pollution, Scrambling Code
Support Huawei RNP Team, create SSV Report Voice, Video and HSDPA
Monitor and Improve KPI Statistic, Weekly Presentation
Handle VIP Customer Complaint
August 2008 February 2009 HiTS Africa, new GSM Operator in Central Africa (Congo and Equatorial Guinea)
2G/3G RF Consultant, HUAWEI Equipment
3 month in DRC Kinshasa, Matadi, Lubumbhasi, Goma, Isiro, Kisangani
3 month in Equatorial Guinea Malabo, Bata
Initial Tuning, Drive Test, TEMS Investigation, Perform Log File
Site Numbering Plan, LAC, SAC, RAC, Model Tuning
Mentoring Local RNP, Support Huawei RNP Team
Cell Configuration, Azimuth, Tilting, Neighbour List
Frequency Planning Strategy (2G) Synthezising Hopping, MRP, FLP Methode, MIAO Planning
Scrambling Code Planning Strategy (3G) RSCP and CPICH Ec/No Plot
May 2006 May 2008, N & TC Department ERICSSON Indonesia
2G/3G RND/Tuning/NPI Consultant
May 2007 May 2008
3G RND & Optimisation, 3G NTS (AXIS) Jakarta Project (WCDMA RAN P4, P5, P6)
Planning and Tuning Activity
Scrambling Code Planning Strategy, SC 8 Group, Create Polygon
Review Existing Code Planning
Create Polygon Cluster Drive Test
TCPU, Model Tuning, MCOM, TEMS Investigation, TEMS RA, MapInfo
CPICH RSCP Plot, CPICH Ec/No Plot
Create CDD, Create CDR UtranCell, LAC, RAC, SAC, CI, Scrambling Code, CpichPower, tCell
Antenna Type, Tilt and Azimuth, Feeder Loss
Neighbour Relation (Soft/Softer HO, IRAT Handover)
Drive Test Tems Investigation Scanner, Voice, Video, Data
Perform Drive Test Report CSSR, Call Drop, HOSR, Accessibilty, Retainibility, Coverage, Troughput
Initial Tuning, CpichPower, RACH, qRxLevMin, UL/DLattenuation, AdmissionControl, CongesionControl, SF, Down/Uptilt, Azimuth, SC
Create PAC Report, CS64, CS32, PS64, PS128, PS384, HSDPA
Monitor KPI Statistic, Processing Data kget, VIP Customer Complaint
TCPU 7.1 (RSCP Plot, Ec/No Plot)
ALEX, WCDMA RAN Explorer, Element Manager
Moshel, Winfiol
WCDMA P4, P5, HSDPA
Ericsson RBS 3000, 3206, 3116, 3418, 3518, 3107, 3303, 3412
RNC, RXI, ASC, Channel Element, RXB/TXB Board
May 2006 May 2007
2G Cluster Optimisation Engineer NPI INDOSAT, Jakarta
BSS R11, NPI Jakarta Indosat
Cluster Owner, Maintain and Reach 2G KPI target
Traffic Balancing GSM 900 and 1800, Load Sharing
Monitor and analyse KPI and Statistic counter, Traffic Capacity analysis
Monitor Capacity GSM900/1800, Utilization GSM900 and GSM1800
Redimensioning TCH and SDCCH due to capacity and location update
Perform slide presentation to customer action taken and daily KPI trend
KPI Weekly meeting presentation on customer
Handle Customer Complaint
Change Parameter GSM Radio Network Feature Cell and BSC level to meet KPI CSSR, CDR, T_Cong, S_Cong, HOSR, RACH.
Activate (trial) GSM Radio Network Feature Power Control, Urgency HO
Analyse log file from Drive Test result (TEMS), perform drive test
Site visit to identify hardware problem, tilting, bearing, antenna type
FLP, MAIO Planning, Frequency Plan, Dualband Single BCCH
RNO MRR, FAS, FOX, NCS, NOX, RIR, CNA, WinFiol
MCOM 2G, MapInfo 7.0, TEMS Investigation, TEMS Route Analysis
TCPU 7.0, TCPU 7.1, ALEX
Sept 2005 April 2006 HUAWEI INDONESIA (Swap Siemens to Huawei)
2G RF Consultant
Nominal planning, site survey, fix planning, strategic for swap and expansion planning, drive test, frequency planning, system parameter and database
Define cluster, route for drive test before and after swap. Prepare system parameter for swap and expansion.
Monitor and control the swap and expansion network progress and pre lounch optimization for new BTS. Monitor and control the Daily and Weekly OSS network performance.
Report and doing presentation drive test result before and after cluster swap and new BTS. Doing optimization to reach the KPI target CSSR, CDR, CSR, MPD, HOSR, PSR, LUSR. Doing meeting and presentation to customer, BSS team, TRS team, Project Manager every week to show and evaluate the OSS network performance, expansion and swap rogress .
Doing ATP (acceptance) for the successful cluster to achieve the KPI target. Doing benchmarking with other operator for signal strength, CSSR, CDR, SQI and PDD (Post Dial Delay).
November 2004 August 2005 GrameenPhone, 1st GSM Operator in BANGLADESH
2G RF Consultant, Ericsson Equipment BSS R10
Planning and Optimisation Activity
Nominal Planning, Site Survey, TSSR
Colocate 900 and 1800 in single BCCH, Multy Band Carrier (MBC)
Simulate Coverage Prediction on ASTRIX Planning Tools from Teleplan.
Create GSM Plan/Engineering Table (Antenna Height, Antenna Direction, Antenna Type, Tilting, Cell ID, LAC and BTS Type)
Synthezising Hopping, MRP, FLP Methode, MIAO Planning, HSN Planning
Create CDD, Frequency Plan (Tools Fallows and Mapinfo), define neighbour relation, define ACCMIN, BSPWR, RLTO, dimensioning time slot (BCCH, SDCCH, PDCH, TCH) . Define Channel Configuration such as TCH/F, TCH/H, Comb.BCCH with 4 SDCCH or UncombBCCH. SDCCH Dimensioning, SDCCH+CBCH and Cell_Res_Hyst (Location Update). Define Urgency HandOver (Talim, Maxta ).
Monitoring Daily/Weekly Statistic Report (KPI)
Redimensioning SDCCH, change HSN, create new HO relationship, clean unnecessary HO relation
Achieve target KPI MPD, CDR, CSSR, HOSR, SDCCH Congestion, TCH Congestion, TBF Success Rate
Drive Test with TEMS, analyse the drive test result, processing, plot and generate report drive test result
RNO MRR, NCS, FAS, WinFiol, TEMS, MapInfo
August 2004 November 2004 NOKIA Indonesia (Under Nexwave)
Transmission Planning Consultant
INDOSAT Project Bali and Surabaya, Swapt Alcatel to Nokia
Perform LOS Survey, Supervise LOS Survey Report from SubContractor
Checking Existing E1 Cross Connection before Swapt Execution
Calculate Transmission Link Budget, Flexy Hopper Transmission
March 2001 August 2004 ERICSSON Indonesia
RBS and Transmission Supervisor (GSM+CDMA)
Testing, Commisioning, Integration Test for GSM RBS, CDMA RBS and Minilink
GSM RBS 2206, 2306 2106, 2202, 2203, 2302, 2102, DXU, CDU, PSU
CDMA RBS 1127, 1130
Rehoming Link TRS (Minilink C, C micro, E, E micro)
X Connect E1 from RBS to BSC (RBLT), TRS Connectivity (MiniLink C, E), Upgrade
Upgrade Master Extension RBS, Cascade (Multipoint), Upgrade Transmission 1+0, 1+1
Local OMT, OMT2, TEMS, Minilink Network Manager, MSM, Site Master, BER Test
CDMA RBS 1127, 1130, Create/Update Configuration Version (CV)
Test Call, Basic Functionility Test, Checking PN Code, Handover Successful
Tools Element Manager (EMAS)
Ericsson Project List (Operator) TELKOMSEL (turn key GSM 900+1800), EXELCOM (GSM 900+1800), LippoTel (GSM 1800), TELKOM Flexy
Dec 2000 Mar 2001 SIEMENS Atea, Abidjan, Ivory Coast, West Africa
2G RNP Consultant
Planning and Optimisation
Site Survey, Frequency Planning, Create NDB for new site integration
Drive Testing with Tems 3.1, Collect data, Processing, Analyse and Perform Report Rx_Qual and Rx_Level in MapInfo
Create and Delete the necessary/unnecessary HO relation
January 1996 December 2000 INDOSAT, 1st GSM Operator in Indonesia
2G Optimisation Engineer
Optimisation Activity, Jakarta Area
Radio Frequency Planning, Radio Network Feature
WCDMA HSDPA System Technician, LZU 108 6383, ERICSSON
WCDMA RAN P6, LZU 108 6911, ERICSSON
WCDAM RAN Protocol and Procedure, ERICSSON
MOSHELL, ERICSSON
WCDMA RAN Configuration, LZU 108 6120, ERICSSON
WCDMA RAN Functionality, LZU 108 5886, ERICSSON
WCDMA RAN Tuning, LZU 108 6237, ERICSSON
WCDMA RAN Design (RND), ERICSSON
WCDMA Tems Cell Planner (TCPU), ERICSSON
WCDMA Air Interface, ERICSSON
WCDMA System Overview, ERICSSON
GSM OSS-RC RAN Optimisation, LZU 108 5963, ERICSSON
GSM Radio Network Feature, ERICSSON
Quality Audit Installation of RBS and MiniLink, ERICSSON
Ericsson Minilink Commisioning, ERICSSON
Ericsson RBS Commisioning, ERICSSON
Excellent Performance & Hard Working Certificate, ERICSSON
Ericsson xLNET Indoor Solution, LZU 108 5816, ERICSSON
Climbing Tower Certificate (PLN), ERICSSON
GSM RBS 2000 family, LZU 108 3241, ERICSSON
GSM System Survey, ERICSSON
Qvoice System Training, Mecomb Singapore
Team Building, SATELINDO
BSS 2, SATELINDO
Intruduction to GSM & PCM30, TMobile
UNIX Full Package Training, INIXINDO
Huawei Tools
Genex Assistant, Genex Probe
M2000, LMT, Genex Nastar
MML data
Failure Counter, NE Report, RTWP
ERICSSON Tools
TCPU, TEMS Investigation, TEMS Route Analisys
MCOM 3G, MCOM 2G, MapInfo, Google Map, Map Source
WCDMA OSS RAN Explorer, WNCS, ITK, Propagation Delay
Element Manager (EMAS), RANOS, CITRIX, GO Global
MOSHELL, Nexplorer, data kget
Ericsson Site Handler
WinFiol, Command Handling
CNA, MRR, FAS, NCS, FOX
Ericsson Static Analyser (Analyse KPI Daily Statistic), ALEX
OMT, Creating IDB, MSM, Tems Pocket
RBS 2000 family (2202, 2206, 2102, 2302, 2106)
RBS 3000 family (3202, 3206, 3101, 3107, 3412, 3303)
RBS 2000 Testing, Commisioning (DXU, CDU, TRU, PSU, External Alarm)
CCP Platform, Uu, Iub, Iur, Iu-cs, Iu-ps, RANAP, RANSAP, RLC, RAB
NC, RXI, ASC, Channel Element, RXB/TXB Board
Other Tools/skill
Actix, QVoice, Nemo
MapInfo 7, MapInfo 8, PlanChecker, ConMand
Pegassos, ASTRIX Planning Tools
WCDMA R99, P4 and P5, P6, P7, HSDPA
Scrambling Code (PN Code) Planning Strategy, create SC manually
CDR (UtranCell, CPICH, LAC, RAC, SAC. Cid)
IRAT Handover (3G-2G)
RAB, CE Configuration, PS64/64, PS64/128, PS64/384, PS64/HSDPA, PS384/HSDPA
Monitoring and analyse KPI Statistic (CS, PS) CSSR, CDR, HOSR, R99 throughput DL/UL
GSM BSS R8, R9, R10, R11 and R12
2G/3G Dimensioning
Propagation Model, Link Budget Calculation, Monte Carlo Analysis
Frequency Planning Strategy, Global Frequency Retune
BCCH Planning, MAIO Planning, FLP, HSN Planning
CDD (GSM Parameter)
GSM Radio Netwrk Feature MBC, CLS, HCS, ACLC, HR, AMR, Power Control
BER Test, Anritsu Site Master (DTF, FTF)
E1 end2end cross connection (RBS to BSC/RNC)
Cote dIvoire (Ivory Coast, Abidjan) West Africa
Dhakka, Bangladesh
Democratic Republic of Congo, Kinshasa, Central Africa, Sub-Saharan Africa
Equatorial Guinea, Gulf of Guinea, Atlantic Ocean, Central Africa
Oman (Muscat), Middle East
|