- Provided technical troubleshooting supports required to recover from the network problems after new sites come on-air.
- Directing the activities and leading Cluster optimization of Augere-Bangladesh wimax network on behalf of UCE.
- Single Site Optimization
- Area optimization
- Neighbor Planning of Augere-Bangladesh wimax network.
- Drive Test analysis for site health and performance analysis.
- Coverage prediction & Planning with Atoll
- Work Experience in Huawei Axiata Network care solutions project
- MW Radio (SDH & PDH) Link survey & Planning in Srilanka Project
- Map table top studies, path profile analysis and Link budget computations using computer softwares (Path Loss ver. 4.0 ) to determine the Radio system requirements such as antenna height, antenna gain requirements and the path availability
- Documentation including AutoCAD Drawing (Technical Reports & Installation document for Customers.
- Line of Site (LOS) Survey in AKTEL, WARID project and prepared report under Ericsson
- Commissioning of HUAWEI GSM BTS 3012-V2 in Grameen Phone Swap Project.
- Commissioning of HUAWEI GSM BTS 3012 in AKTEL and Banglalink Project.
- Commissioning and Supervising Hardware Installation of ERICSSON 2206V2 BTS in AKTEL Project.
- Supervision of Hardware Installation of HUAWEI HLR, MSC, CDMA BSC 6600 for PeoplesTel Project at Chittagong.
- Commissioning and Supervising Hardware Installation of HUAWEI
- Microwave Radio RTN 600, TRM Rack, MW Antenna, Alignment of Microwave antenna and preparation of DDF in RANKSTEL Project.
- Supervising Installation of Emerson Power Supply System in Banglalink Project.
- Supervision for the Installation of Emerson Rectifier for Banglalink.
- Supervising Installation of ELTAK and DELTA Power Supply System in Grameen Phone Project.
- Supervision for the Installation of Emerson Rectifier for Banglalink.
PROFESSIONAL EXPERTISE(EQUIPMENT & TOOLS)
- Tektronix YBT250 NetTek Spectrum Analyzer
- Anritsu Site Master for DTF & VSWR calculation
- MW Link BER Tester
- Couei X CAL-X (WiMAX Drive Test).
- Couei XCAP-X COUIE (Analysis & Post Processing).
- X Cal-XD Wimax Scanner.
- Atoll 2.8 (For WiMAX coverage prediction, simulation)
- Google Earth Professional
- TEMS Investigation & Data Collection (Drive test data collection & Post processing)
- Aexio GE cell export tool.
- Global Mapper 10.
- Microwave Link Pathloss Planning tool (Pathloss 4.0)
- MapInfo 9.5
- AutoCAD
- Huawei Genex Probe (Drive Test tool).
- Actix Analyzer
- Operating Systems Windows 2000, Windows9x, XP, Vista, Windows 7.
- Wimax CPE Testing AWB & ZTE (Beceem chip), Seowon (WiMAX GCT), Siemens (Model Gigaset), Shuttle (Green packet chip)
- Programming Knowledge with PHP, ASP, JSP, MySQL, Java
- IP networking, routing protocols (OSPF, RIP, EIGRP, IP), Security and VPN, Router configuration (CISCO) and Various Server configuration as DNS (BIND) Server, Web Server (Apache), FTP Server
Employer:
UCE Telecom Solutions Ltd.
Job Title:
RF Expert - Senior
Start Month/Year:
04/2010
End Month/Year:
Current
City:
Dhaka
Country:
Bangladesh
Description:
Performing Cluster optimization of 226 sites in Dhaka & Chittagong.
Perform Optimization by fine tuning antenna tilts, azimuth, height & power reduction parameters with Atoll.
Performed single site optimization of newly integrated sites inside the cluster.
Run Pre and Post simulation for cluster changes hard parameters using Atoll.
• Plan capacity sites within the Dhaka wimax network to share the users load.
• Neighbour Planning for Dhaka cluster WiMAX sites & delivering neig
Employer:
Pi Technologies Ltd.
Job Title:
RF Engineer
Start Month/Year:
11/2009
End Month/Year:
03/2010
City:
Dhaka
Country:
Bangladesh
Description:
• Carried out Drive tests with Wimax Air Interface Test Tool (Couei XCAL/XCAP-X).
• In-building walk test for Wimax
• Performed sector functionality and handoff test
• Attending customers facing coverage problems and find solutions for the problem by changing antenna azimuth & beam forming parameters.
Scope of the project: Log file collection, Post processing, RAN problem Identification & solution & Report submission.
Employer:
SK telesys Telecommunication System
Job Title:
RF Engineer
Start Month/Year:
01/2009
End Month/Year:
10/2009
City:
Dhaka
Country:
Bangladesh
Description:
• Work Experience in “Huawei Axiata Network care solutions” project on behalf of SKTS., Bangladesh
• Carried out Drive tests with GSM Air Interface Test Tool (TEMS Investigation Data Collection).Performed sector functionality and handoff test
• Involved in Single site Pre and post drive test (Idle Mode, Dedicated long call & Dedicated short Call) with Coverage & Quality verification, all kind functionality checking (Call setup, Handover etc), throughput checking (GPRS, FTP) and engineering parameters verification.
• Performed sector functionality and handoff test prior to cluster optimization.
• Report Generation for RX level, Rx Qual, SQI, functional status & the information of planning data using TEMS™ Investigation Route Analysis module, MAP Info 9.0 according to customer requirements.
• Done corrective rectification of planning data like Azimuth, Tilt, frequency, neighbours etc.
• Determining overshooting problems, neighbor list etc.
• Performed Radio Frequency Interference (RFI) checking from external operators for 900 MHz and 1800 MHz band using Tektronix YBT250 NetTek Analyzer.
• Performed functionality checking drive test before/after of BSC software up-gradation.
• OMC data collection (For Traffic Statistics data) & sorting out interfered sites from Huawei Terminal.
• Verified Layer3 Cell Broadcast message receiving capability of BTS due to customer complains in Teletalk network for both Huawei & Siemens zone from different handsets on behalf of Huawei.
Test Tool: TEMS data collection and handsets: Sony Ericsson K790i, Nokia 6230i & Siemens handset
Employer:
CTL
Job Title:
Associate Engineer
Start Month/Year:
02/2007
End Month/Year:
12/2008
City:
Dhaka
Country:
Bangladesh
Description:
• Responsible for Network Deployment: Site surveys, co-location studies and antenna placement.
• Conduct acceptance testing of transmission link by reviewing of As-built plans based on actual physical inspection, Receive Signal Level RSL, Transmit Power and Far-end name based on the link budget, software loop test, 5 min BER test, local/ remote reset, alarms testing and 24-hour BER testing
• Conduct acceptance testing of BTS by performing VSWR and DTF reading, Return loss, checking RF parameters and BTS configuration based on approved Channel Loading Plan (CLP), Call Scenario/test calls, local/ remote reset, alarm testing, review of As-built plans based on actual inspection and site inventory.
• Made test calls and functionality tests during PAT.
• Performed Commissioning and testing Ericsson Minilink (MMU module) classic and traffic nodes using Ericsson MSM software.
• Performed supervision of hardware Installation of ERICSSON Microwave Radio MiniLink E, Minilink TN, TRM Rack, MW Antenna, Alignment of Microwave antenna and preparation of DDF in AKTEL Project.
• Participated and supervised antenna swapping at BTS sites.
• Check frequency assignment on each sector, performed hand over testing on neighboring cells
• Checked the Quality of installation and Performance before hand over to costumer.
• Work Experience in International project for MW Radio (SDH & PDH) Link survey & Planning in Srilanka.
Education Level:
Bachelor's Degree
School Name:
East West University
Major:
Information & Communication Engineering
City:
Dhaka
Country:
Bangladesh
Graduation Date:
03/03/2008
Description:
It is designed to equip its graduates for careers in the design, development and management of information networks. These can range from small company local area networks (LANs) to the global telephone and Internet networks, which are now converging towards a single entity. The program is very much concerned with the essential (but usually invisible) backbone or infrastructure of data communications systems that connects all the phones, faxes, computers and other multimedia service.