From 09/09/2009
to 13/11/2009
ALCATEL_LUCENT Armenia
Orange Armenia
MISSION Commissioning & installation supervision MPR 9500 & AWY
Commissioning of MPR 9500 MSS8, MSS4 Backbones with 1 GB Ethernet optical interface SFP and capillarity.
Supervising the installation & taking corrective actions Indoor Power, DDF, optical fiber. Outdoor Grounding, waterproof
Quality of installation & Photo reporting
Commissioning, supervising, troubleshooting of AWY 9400
Supervision of MPR & AWY with the 1353 NM IP address, TNM, OSPF, Ethernet cabling
Troubleshooting Alarm & installation verification, changing ODU, modem 300MD, P32E1, Core card, serge arrester
Synchronization configuration and cabling between MPR Tellabs
Cross connection Testing cross connections of E1 & Ethernet between MPR, AWY & Tellabs
Software Installation for MPR 9500 & AWY 9400
Sites acceptances of MPR & AWY links with client Orange Armenia
From 14/01/2009
to 14/06/2009
ALCATEL_LUCENT SRILANKA
TIGO SRILANKA
MISSION Technical Support in transmission Micro Wave
(MXC, SDH, AWY & NM 1353)
Technical Support for all local supervisors & subcontractor commissioners solving all Software & Hardware problems
Commissioning & supervision of installation for 3 Backbones SDH
ALCATEL 9500 MXC 2+0 STM1 XPIC links in 8 &15 GHZ (53 links)
Solving all problems of interferences investigations, changing frequencies band & sub-band, polarity, verifying the use of frequencies in sites
Measuring receiving level of frequencies with Spectrum Analyzers to identify interferences
Reporting & doing synopsis for Backbones & all problems faced
Follow-up the installation & Subcontractors
Doing Material Delivery Request
Sites acceptances with subcontractors
Sites acceptances with client Tigo
Maintenance of links ODU V2, Optical 2X STM1 DAC card, RAC 40 changing
Technical Support for PDH links AWY 9400
Software Installation ALCATEL-LUCENT MR2 for client & local supervisors
Adapting all software versions AWY (version 2.0, 2.1 & 2.1.2 MR) ADM 1650 with BSS software
Maintenance of ADM 1650
Creating MXC SDH NE on the NM 1353
Verifying the supervision on the NM 1353
Swap of IDU 155M optical with INU to insure the synchronization
Dialog SRILANKA
Software Installation for the new equipment MPR 9500
Commissioning & installation for one link MPR 9500
From 20/09/2007
To 17/12/2008
ALCATEL_LUCENT NIGER
IN NIGER
ORANGE Niger
MISSION Supervisor & Commissioner BSS & Transmission Micro wave
Commissioning & supervision of installation for 2 Backbones SDH
ALCATEL 9500 MXC 4+0 STM1 links with 18 GHZ
Sites acceptances with client ORANGE
Maintenance of links ODU V2, Optical 2X STM1 DAC card RAC 3X changing
Commissioning & supervision of installation for PDH links AWY 9400
Commissioning & supervision of installation for BTS MBO2 Configuration Multi-band Cell S222 222
Commissioning & installation of power cabinet POWER ONE PO16
BTS maintenance Reconfiguration, modules changing SUMA
Supervising the installation of BSC ALCATEL A9130 MX
Supervising the wiring & interconnection between DDF of BSC, TC, ADM & Switch
CELTEL Niger
MISSION Supervisor & Commissioner BSS & Transmission Micro wave
Commissioning & supervision of installation for PDH links MXC 9500 INU & INUe
Commissioning BTS ALCATEL MBO1 using BTS Terminal ReleaseB9
TMA commissioning (Tower Mounted Amplifier)
UPGRAD BTS EVOLIUM withTRE to TWIN TRX
BTS maintenance (changing AGC, TRE, FAN, repairing alarms VSWR
Radios measurement using Site Master Anritsu S333D
Commissioning & maintenance for micro wave links Melody UX9400 & AWY (1320CT)
Verifying Receiving Level resolving problems of Fading, alignment & equipment, Errors Ratio BER, ES, EES
Supervising the installation & commissioning BSC A9130 MX & MFS A9130
Sites acceptances with client CELTEL NIGER
From 24/01/2007
to 24/07/2007
ALCATEL_LUCENT SENEGAL
IN SENEGAL
ORANGE SONATEL
MISSION Supervisor & Commissioner
Realizations
Commissioning BTS ALCATEL MBI5 A9100 using BTS Terminal ReleaseB7/B8
Reporting commissioning rapports CCL
Testing the MIC
Testing the alarms
Radios measures
Radios Measurements using the Site Master Anritsu S331D and reporting
Checking Radio Measurements reports done by subcontractors
Controlling the conformity of measurements results (VSWR, DTF, Return et Cable loss) with specification defined by the operator.
Dual Bande Supervisor
Changing Sectorial antenna from 900 MHz by dual-band antenna, changing feeders, connectors, Site Master measurement & BTS commissioning
Civil Works engineer
Supervising civil works, assembling towers & masts, cable tray, grounding tower & RF cabling
Supervisor of shelter assembly
Assembling HawkStone & ZMI Shelter
Power cabling (TGBT, generator, batteries)
Equipments grounding, cabling, configuring & testing site alarms (high/low T, main & general fail, smoke, door, DC/AC)
Commissioning & testing de HawkStone commander
Troubleshooting & testing Air Conditioning & FAN
Grounding measurement by Earth Test
Sites Survey
Determine positions of shelter, towers, cable tray, grounding...
Sites acceptances with client Orange Senegal
Checking the installation conformity shelters, towers, power equipments & telecommunications equipments (BTS & transmission).
From 24/11/2005
To 23/01/2007
HAYATCOM Tunisie
IN Tunisia
OTT (ORASCOM TELECOM TUNISIa)
Installation, configuration, test, commissioning & PDH links acceptance
(Microwave Alcatel 9400UX/ALCATEL AWY/ NEC PasolinK)
Indoor/Outdoor cabling IDU/ODU, DDF, PCM cables, Microwave antenna installation PDH/SDH
Micro-wave Alignement
Sites Survey (RFI),
Swap
Installation, commissioning & Alcatel BTS acceptance
(Multi-standard Base Station Outdoor BTS 9100 OUT MBO2 GSM, DCS, Multi-band GSM/DCS)
Used software NECTAS, ALCATEL1320CT, PNMT, BTS Terminal ReleaseB7/B8
Civil work (sites building & tower assembly), site survey, supervising teams
Changing Sectoriel antenna from 900Mhz by dual-band antenna, changing feeders, connectors, diplexer cabling Site Master measurement.
TT (TUNISIE TELECOM)
Node B ERICSSON installation
INode B HUAWEI installation
ZXWR B09 V3.0 WCDMA Macro Cell Indoor Base Station ZXWR B06C V3.0 WCDMA Compact Base Station Installation, commissioning & acceptance of large bande multiplexer Huawei Technologies (SmartAX MA5100 Multiservices Access System)
Huawei Training Center
Large band multiplexer installation, DSLAM Digital Subscriber Line Access Multiplexer, Huawei Technologies MA5100, MA5300, (Multiservices Access System), MA5200G
Installation of SDH transmission equipments OSN1500 OSN2500, OSN 3500, METRO 1050, DWDM
Installation of mobile radio equipments BTS, BSC, MSC, HLR, VLR
IN Mali
SOTELMA (Society of telecommunications in Mali)
Installation & acceptance of BTS WLL using CDMA Huawei Technologies
Installation &cabling of power cabinet Emerson.
SNCFT ( National Society of railway in Tunisia)
Optical fiber loss measurement using AGILENT equipment, link budget
From 14/03/2005
To 23/11/2005
HAYETCOM ALGERIE
Algeria Telecoms MOBILIS
BTS HUAWEI installation
Indoor installation Fixing BTS, Rectifier, DDF, batteries, wiring power & transmission cable, Site Master Measurement.
.
Outdoor Installation antenna installation, feeders & connectors 7/8, 5/4, 1/2 installation, grounding kit
Installation & cabling power cabinet Emerson.
Installation of BSC HUAWEI
Installation & configuration of microwave PDH links NEC
WATANIA TELECOM en Algeria
NEDJMA
RBS ERICSSON Installation
Indoor Fixing BTS, Rectifier, wiring power & transmission cable, Site Master measurement, grounding
Civil works Site Survey, checking reserves, supervision for tower installation
Sites acceptances
|