Employers register here
search resumes, live profiles & candidates, find online candidates, telecom wireless jobs, live jobs search engine, post telecoms jobs free
Candidates register here
submit resume, telecom wireless jobs & careers telecom contracts, technical advice, industry gurus wireless technology experts, socialize & have fun :)
Employers on-line (46)
Candidates on-line (706)


Preview Resume/CV

ABDULKADİR SAHİN

Resume Keywords: optimization,3g,RNO

Contact Information


Please log in to see contact information!
RAN Planning and Optimization Engineer

Career Summary
A highly motivated, result-focused RF Planning, optimization and Design Engineer with over 5 years of experience in RF and Field engineering with team notion that focused on 3G optimization. Several years of experience on maintaining and troubleshooting legacy systems.

Highlights

- Proven track of strong project management of large scale networks build-up.
- Proven work ethic, good communications skills and high level of responsibility.
- Comfortable interfacing with all levels of management.
- Ability to work under time-pressure and takes great pride in seeing a task through from start to finish.
- Well organised, high quality worker.
- Extensive knowledge of GSM/UMTS networks and Algorithm.
- Quick learner. Motivated and dedicated to getting the job done right.
- Work effectively independently or as part of a team.
- Willing to travel and relocate.








Experience
Huawei Corporation,http//www.huawei.com, October 2010 to Present
3G Optimization Consultant
I responsible for Cluster KPIs and optimization of Swap Project and organizing DT Team according to optimization activity, I am interface between the customer and the Huawei.
My Related Staffs are below
- Participate in day to day activities of RF Optimization.
- KPIs improvement to achieve target of acceptance.
- Performing 3G Optimization by statistical data and analyzed logs,
- Parameter Update (related to neighbor, CPICH power, RF Issue, SHO/ISHO) and Physical Changes (such as down/up tilt and re-azimuth) to improve quality of network.
- Performance Optimization and Capacity Management (upgrade hardware related to blocking issue ie E1 expansion, CE expanison)
- 3G Parameter Optimization for KPIs Improvement. (Accessability, Retainability, Traffic, Utilization, Mobility, HS Performance.)
- Monitoring KPIs in daily based for whole region and related analysis
- Worst Cell analysis and related action.
- Weekly NQ Meeting with customer.


Vodafone Mobile Operations Limited, http//www.vodafone.com.tr May 2009 to October 2010
RAN Planing&Optimization Engineer
I responsible 3G/2G ATOLL Design and RF Planing and Optimization (with actix, Genex assistant, probe) of Network of the North CYPRUS (250 3G sites) and Now,I am responsible for Whole 3G Network KPIs and Optimization, I have been doing below job,
- Participate in day to day activities of RF Optimization.
- Performing 3G Optimization by statistical data and analyzed logs,
- Analyzing 3G drive test data
- Parameter Update (related to neighbor, CPICH power, RF Issue, SHO/ISHO) and Physical Changes (such as down/up tilt and re-azimuth) to improve quality of network.
- Performance Optimization and Capacity Management (upgrade hardware related to blocking issue ie E1 expansion, CE expanison)
- Problematic areas and Features Optimization both cell and RNC level, congestion, Load Sharing, Inter-Intra freq HO, iRAT, CPICH power, azimuth/tilt, UL RSSI, PP
- Providing the improvement both in optimization and drive test results
- 3G Parameter Optimization for KPIs Improvement. (Accessability, Retainability, Traffic, Utilization, Mobility, HS Performance.)
I am monitoring weekly and daily based KPIs (with M2000) that
Voice CSSR
Voice RAB Establishment Failure Rate
Voice RAB Abnormal Release Rate
Voice RRC Connection Request Failure Rate
Abnormal Release for RRC
CS Voice Call Traffic (Erlang)
CS Video Call Traffic (Erlang)
HS RAB Establishment Failure Rate
HS RAB abnormal Release Rate
Congestion KPIs CE, Power, Code, Iub band congestion with related whole counters.
- 2G/3G TSS,
- Foot print optimization (antenna tilt, hight, position update) acording to stats and some network problems.
- Customer complains and solutions,
- Indoor Planing and Design,


IRIS Telecom A.S, http//www.iris-tele.com May 2006 to May 2009
RF Planning, Design and Optimization Engineer
During first quarter of the 2009, I have done indoor planing and design for Huawei company which is client of the Vodafone in 3G Turkey Project. I was responsible for 4 indoor sites during 4 mounth, from start to end. I had done blow work during this Project

- Swap of RF GSM Antennas with UMTS antennas to make specific sites 3G ready.
- Planning new sites on the basis of coverage, to maintain thresholds provided by Vodafone in specific clutters.
- Planning of new sites on the basis of capacity by monitoring traffic stats and call blocking.
- Planning of sites and repeaters in ATOLL Planning tool.
- Managing site survey teams for draft visit and identification of proper candidates.
- Making sure that sites are planned on grid and are following our standard azimuth and inter site distance criterion.
- Reducing the number of Sites in the network using ACP by maintaining required level of coverage, quality and Traffic.
- Using drive tests to smooth the coverage of sites in Optimi and Atoll and deciding the models to be used.
- Indoor Design with RF-VU
- Indoor planing on site. (TSS)
- Official TSSR file preperations.
Official Acceptance file preperations.

Member of professional staff with responsibility for strategic designing and planning in Motorola & Vodafone Roll-Out Project. Leading whole Istanbul and Black Sea clusters (almost 1000 sites) designs and planning.
New site design using ATOLL for Istanbul, I have done all Istanbul design and responsible for design KPIs for whole istanbul region.

- Whole cluster acceptance
- KPIs calculations
- MER calculations
- Acceptance report preparation
- Polygon revision (with MapInfo and ATOLL)
- Outdoor and indoor system design (macro & micro) in Istanbul
- I done optimization according to traffic, congestion, overlap, overshoot case with EMPOWER(Motorola optimization tool) tool.
- Disaster recovery design for Istanbul and black sea region.
- Decided Site selections for Istanbul regions
- Prepared SARF reports
- Traffic calculations and cell dimensioning
- Technical site surveys (Deciding pole locations, RF antenna types, tilts and azimuths)
- Finished Site validations
- Finalized Physical Optimization for Vodafone.
- Over 250 sites that I had done its physical optimization for black sea region and east Anatolia region in Turkey.
- I decided to add sector, change the azimuth, antenna type, height etc.


ELTEM-TEK A.S. , http//www.eltemtek.com, 01/2005 05/2006
Field Engineer

- I have been working at EU Project which is Improvement of the Frequency Performance of the Turkish Power System in Accordance with the UCTE Criteria.
- Implementing Primer Frequency Control Performance Tests of Power Plant.
- Preparing Terms of References for the EU Project (Improvement of the Frequency Performance of the Turkish Power System in Accordance with the UCTE Criteria).





Education

Fatih University, Turkey Completed in 2004
Bachelor of Electronics Engineering
Skills

Theoretical and practical knowledge of wireless technologies UMTS,GSM and GPRS/EDGE.
UMTS Network optimization, KPI improvement.
Deep Knowledge of HUAWEI 3G counters.
GSM 900/1800, GPRS/EDGE Network optimization, KPI improvement.
TEMS investigation drive test and analysis tool.
Excellent knowledge and practice about MapInfo (I used in whole roll-out project for stanbul and black sea region)
Excellent working knowledge of cellular planning tools Forsk Atoll.
Excellent working knowledge of post processing tool which is ACTIX (analyzer,Spotlight).
Excellent working knowledge of post processing tools which is Genex (Probe/assistant)
Excellent knowledge about UMTS, GSM 900/1800 Network cell planning and RF design.
Outdoor and indoor system design (macro & micro)
Nokia NetAct Planner, TEMS 900/1800, TEMS Investigation,
MS Office Applications.
Operating Systems Win9x/NT/XP
Programming Languages PIC programming, Assembler 8086 (basic)
Networking TCP/IP.
Application Software Multisim, Auto-CAD, SolidWorks, Protel, Eagle, MPLab, PIC Basic,Electronic Workbench, PLC, Lab View.

Training and Seminars

Seminars
09.08.2002 ISO14001&16946
14.08.2002 Finance
15.08.2002 Order Management ve Logistic.
20.08.2002 Kaizen
23.08.2002 Presentation Technics.
26.08.2002 Manufacturing.


Certificates
GSM Network Indoor Design Methods
MIKOM-ANDREW 15.10.2008 - 15.10.2008 (6 Hours)
SYS04 Introduction to BSS Planing
Motorola Corp. 07.10.2008 - 09.10.2008 (24Hours)
MapInfo 9.0 (2008)
RAN Dimensioning
HUAWEI 04.05.2009 - 06.05.2009 (20Hours)
RNP&RNO Principles
HUAWEI 11.05.2009 - 15.05.2009 (30Hours)
Radio Network Design, Planing and Tuning
HUAWEI 18.05.2009 - 19.05.2009 (12Hours)
Radio Network Performance Management
HUAWEI 20.05.2009 - 22.05.2009 (18Hours)
WCDMA Radio Network Features and Algorythm
HUAWEI 25.05.2009 - 29.05.2009 (30Hours)


Motorola Training
GSM Overview (2 Days)
GSM Idle Mode Behaviour Istanbul (2 days)
GSM Locating Algorithms Istanbul (2 days)
Site Survey and Site Selection Workshop (2 Days)
Cell Planning Introduction (2 Days)
Indoor Planning and Design training (2 Days 2008)
IDGP-Intelligent Design and Growth Planning (2 Days 2008)
UMTS Overview (2 Days 2008)

Personal Information

Languages English (Fluent), Turkish (native)
DOB 16th August 1980.
I like travelling, cooking, swimming, playing chess, playing basketball (in regional league) and researching on new technology.
I am an Active member of IEEE www.ieee.org and Gelisim Platformu (IT Society) Istanbul www.gelisimplatformu.org
References

Ferhat Acar, Project Manager, IRIS Telecom. Corp.,
ferhat.acar@iris-tele.com, +90(532)7699725
Isa Goksu, Agile architect, ThoughtWorks, isa.goksu@thoughtworks.com, +1(403) 975-6466
Cenk Tantverdiler, Network Delivery Director, AVEA
cenktan1978@hotmail.com, +90555 255-8830
Suleyman Gl, UMTS/GSM Expert, CEO of Radikom Corp., suleyman.gul@radikom.com.tr, +90541 525-2509
Musa KAYICI, RNP&O engineer, Huawei corp.,
musa.kayikci@huawei.com, +90530 604-1195
Tufan NAL, CTO, HUAWEI,
tufan.unal@huawei.com, +90 530 5055327, +90 543 9011657
Sohail Zekaria, Network Planing and Optimization Manager, VODAFONE-CYPRUS,
szekariya@kktctelsim.com, +90542 851-0011
Employer: ELTEM-TEK Co.
Job Title: Control System Engineer
Start Month/Year: 01/2005
End Month/Year: 05/2007
City: ANKARA
Country: Turkey
Description:
- I have been working at EU Project which is Improvement of the Frequency Performance of the Turkish Power System in Accordance with the UCTE Criteria.
- Implementing Primer Frequency Control Performance Tests of Power Plant.
- Preparing Terms of References for the EU Project (Improvement of the Frequency Performance of the Turkish Power System in Accordance with the UCTE Criteria).
Employer: IRIS Telecommunication and Engineering Services
Job Title: RF Planing, Design and Optimization Engineer
Start Month/Year: 05/2007
End Month/Year: 05/2009
City: ISTANBUL
Country: Turkey
Description: During first quarter of the 2009, I have done indoor planing and design for Huawei company which is client of the Vodafone in 3G Turkey Project. I was responsible for 4 indoor sites during 4 mounth, from start to end. I have done blow work during this Project;
- Indoor pre-TSS.
- Indoor Design with RF-VU
- Indoor planing on site. (TSS)
- Official TSSR file preperations.
- Official TSS file preperations.
- Official Acceptance file preperations.

Member of professional staff with responsibility for strategic designing and planning in Motorola & Vodafone Roll-Out Project. Leading whole Istanbul and Black Sea cluster designs and planning.
New site design using ATOLL for Istanbul, I have done all Istanbul design and Iresponsible for design KPIs for whole istanbul region.

- Whole cluster acceptance
- KPIs calculations
- MER calculations
- Acceptance report preparation
- Polygon revision (with MapInfo and ATOLL)
- Outdoor and indoor system design (macro & micro) in Istanbul
- I done optimization according to traffic, congestion, overlap, overshoot case with EMPOWER
- (Motorola optimization tool) tool.
- Disaster recovery design for Istanbul and black sea region.
- Decided Site selections for Istanbul regions
- Prepared SARF reports
- Traffic calculations and cell dimensioning
- Technical site surveys (Deciding pole locations, RF antenna types, tilts and azimuths)
- Finished Site validations
- Finalized Physical Optimization for Vodafone.
- Over 250 sites that I done its physical optimization for black sea region and east Anatolia
region in Turkey.
- I decided to add sector, change the azimuth, antenna type, height etc.
Employer: VODAFONE Mobile Operations Limited
Job Title: RAN Planing and Optimizaiton Engineer
Start Month/Year: 05/2009
End Month/Year: Current
City: LEFKOSA
Country: Cyprus
Description: I responsible 3G/2G ATOLL design and RF Planing and Optimization (with actix, Genex ssistant, probe) of Network of the North CYPRUS. Now, I handle 3G optimization project with Huawei Co, also I have done below job,
- Indoor Planing and Design,
- 3G optimization, KPIs improvement, (site verification, optimization with post processing tools(actix, Genex))
- Drive test route defining,
- 2G/3G Drive test,
- 2G/3G TSS,
- Customer complains and solutions,
- Foot print optimization (antenna tilt, hight, position update) acording to stats and some network problems,
 
Education Level: Bachelor's Degree
School Name: Fatih University
Major: Electronics Engineer
City: ISTANBUL
Country: Turkey
Graduation Date: 24/11/2004
Description: Not Specified
 
Education Level: Certificate
School Name: HUAWEI Training Department
Major: WCDMA Radio Network Features and Algorythm
City: ISTANBUL
Country: Turkey
Graduation Date: 29/05/2009
Description: WCDMA Radio Network Features and Algorythm
HUAWEI 25.05.2009 - 29.05.2009 (30Hours)

 
Education Level: Certificate
School Name: HUAWEI Training Department
Major: • Radio Network Performance Management
City: ISTANBUL
Country: Turkey
Graduation Date: 22/05/2009
Description: Radio Network Performance Management
HUAWEI 20.05.2009 - 22.05.2009 (18Hours)
 
Education Level: Certificate
School Name: HUAWEI Training Department
Major: • Radio Network Design, Planing and Tuning
City: ISTANBUL
Country: Turkey
Graduation Date: 19/05/2009
Description: Radio Network Design, Planing and Tuning
HUAWEI 18.05.2009 - 19.05.2009 (12Hours)
 
Education Level: Certificate
School Name: HUAWEI Training Department
Major: RNP&RNO Principles
City: ISTANBUL
Country: Turkey
Graduation Date: 15/05/2009
Description: RNP&RNO Principles
HUAWEI 11.05.2009 - 15.05.2009 (30Hours)
 
Education Level: Certificate
School Name: HUAWEI Training Department
Major: RAN Dimensioning
City: ISTANBUL
Country: Turkey
Graduation Date: 06/05/2009
Description: RAN Dimensioning
HUAWEI 04.05.2009 - 06.05.2009 (20Hours)
 
Education Level: Certificate
School Name: Motorola Training Department
Major: SYS04 Introduction to BSS Planing
City: ISTANBUL
Country: Turkey
Graduation Date: 09/10/2008
Description: SYS04 Introduction to BSS Planing
Motorola Corp. 07.10.2008 - 09.10.2008 (24Hours)
 
Education Level: Certificate
School Name: Motorola Training Department
Major: GSM Network Indoor Design Methods
City: ISTANBUL
Country: Turkey
Graduation Date: 15/10/2008
Description: GSM Network Indoor Design Methods
MIKOM-ANDREW 15.10.2008 - 15.10.2008 (6 Hours)
 
Education Level: Vendor Technology Trainings
School Name: Motorola Training Department
Major: GSM Overview
City: ISTANBUL
Country: Turkey
Graduation Date: 11/12/2009
Description: Not Specified
 
Education Level: Vendor Technology Trainings
School Name: Motorola Training Department
Major: • GSM Idle Mode Behaviour
City: ISTANBUL
Country: Turkey
Graduation Date: 11/12/2009
Description: Not Specified
 
Education Level: Vendor Technology Trainings
School Name: Motorola Training Department
Major: • GSM Locating Algorithms
City: ISTANBUL
Country: Turkey
Graduation Date: 11/12/2009
Description: Not Specified
 
Education Level: Vendor Technology Trainings
School Name: Motorola Training Department
Major: Site Survey and Site Selection Workshop
City: ISTANBUL
Country: Turkey
Graduation Date: 11/12/2009
Description: Not Specified
 
Education Level: Vendor Technology Trainings
School Name: Motorola Training Department
Major: Cell Planning Introduction
City: ISTANBUL
Country: Turkey
Graduation Date: 11/12/2009
Description: Not Specified
 
Education Level: Vendor Technology Trainings
School Name: Motorola Training Department
Major: IDGP-Intelligent Design and Growth Planning
City: ISTANBUL
Country: Turkey
Graduation Date: 11/12/2009
Description: Not Specified
 
Education Level: Vendor Technology Trainings
School Name: Motorola Training Department
Major: UMTS Basics and Principles
City: ISTANBUL
Country: Turkey
Graduation Date: 11/12/2009
Description: Not Specified

Languages

English Intermediate
Job Category: 3g WCDMA UMTS Optimisation Job
Job Type: Any Job Type
Job Status: Flexible
Desired Salary: $0 Unspecified
Desired Location: Not Specified
Willing to Relocate: Yes