2G/3G and Transmission implementation and integration engineer
Resume Keywords:
Network implementation management and supervision.
2G/3G networks implementation and integration,Transmission commissioning and integration.
Contact Information
Please log in to see contact information!
Summary
2G/3G and transmission rollout coordination and acceptance, 2G/ 3G integration and troubleshooting. MiniLink Traffic Node, DCN IP and Integration, 2G/3G optimization skills, Drive testing , Ericsson/Huawei Node B integration. Nokia 2G/3G RBS and TRM commissioning and integration. System analysis, design, development, maintenance and support, Experience in IT-research, IT-consulting.
Employment History
March 2007 June 2009 Consultant at Ericsson Egypt ltd Etisalat account.
2G/3G Network rollout coordination and acceptance.
Management and preparation of acceptance documentation, and scheduling acceptance test visits with the costumer.
NodeB Integration, troubleshooting and Test calls using TEMS.
Traffic Node configuration including IP addressing (DCN IP, PPP, OSPF, Traffic over DCN) and integration in Mini Link manager.
Implementing Traffic routing and cross connection on Mini Link Manager.
Awareness of RF planning and optimization.
NodeB OSS integration skills including loading ARW, Initial Cell and Cell relations .
Integration of 2G cabinets (2216, 2116, 2308, 2109) and performing test calls using TEMS.
Defining TG Synchronisation, and RF delay.
September 2005-March 2007
System engineer at NoviaCOM Saudi Arabia
Involved in Ericsson projects, GSME7PO1, PO2, PO3 for Saudi Telecom. Including the following tasks
Implementing the Installation teams of 3G Ericsson NodeB Cabinets (3206, 3107), Testing, troubleshooting and commissioning.
Integration, testing, troubleshooting and commissioning 2G Ericsson Cabinets (2202, 2206, 2116, 2216, 2308, 2109).
Antenna, jumpers, feeders testing with Arnitsu site master.
Expansion of GSM system (Ericsson cabinets 2202/2206, 1800/900), and the Antenna system.
Site Survey and optimization of the installation process.
Expansion of GSM system including EDGE upgrade Swap DXU 11 by DXU 21 and changing to sTru.
Optimization of the time Slots.
Mini-LINK, Mini-Link-E, High capacity, Traffic Node Installation, Alignment, configuration and testing (BER test).
Mini-Link upgrade including increasing traffic and performing protection protocols.
Involved in Testing, Troubleshooting and Commissioning of Ericsson Minilinks E, Minilink (High Capacity type model) and Minilinks Traffic Node.
Involved in Testing, Troubleshooting and Commissioning of DXX Tellabs 6300 family
E1 testing and cross connections.
PAT coordination including PAT Documents preparations and performing PAT with the costumer (Antenna Test, Call Test, Handover test, BER test and site Alarms test).
Ericsson quality principles.
Nokia 2G/3G RBS and transmission commissioning and integration and acceptance.
Involved in Huawei 3G project for STC (Eastern region) Saudi Arabia
3G rollout and acceptance.
Node B Integration and commissioning.
Project acceptance with the costumer.
3G optimization and drive testing.
Education
09/2004-06/2005. National Technical University Kharkov state polytechnic University (NTU KhPI) Ukraine. Masters in software of computer-aided management systems . System analysis engineer.
09/200007/2004. National Technical University Kharkov State Polytechnical University (NTU KhPI) Ukraine. Bachelor in Computer Science.
Developed projects
Development of a software for the traffic accounting of INTERNET-Club (03-2003)
The system allows the administrator of the Internet-Club to calculate the time the user used the PC and the Internet traffic the user received through the work session and allows the manager to have a daily report of the clubs work . Also it allows the users to choose the tariff plan they want to work with , also the registration of permanent clients to get discounts and print of the bill including the report of work and calculation of VAT .Using
Platform Windows 9x/NT
DBMS MS SQL server 7
Middleware ADO, Win32 API
Network TCP/IP
Languages SQL, C++
Tools C++ Builders 6, Rational Rose , Platinum ERWin
GUI Windows 9x/NT native
Development of a Web Search engine.(3/2004)
Development of a search engine which allows World wide users to register on this site and suggest their sites to be searched by the engine. Using
Platform Internet explorer /any other product for Linux Platform
DBMS MS Access
Middleware ODBC
Network http
Languages VBScript , SQL , HTML
Tools Visual studio .NET, ASP
Development of a Decision-Support system for management of the growth of technical equipment of an Internet Provider.(2003/2004).
Development of an information , Algorithmic and software of Control Task for the development of Enterprise Corporate Networks.(2004/2005).
Language Skills
Arabic native
English fluent
Russian fluent
Portuguese Not bad
References
- Wael El ward, Total Project manager Ericsson MUNAF, Email wael.xw.elward@ericsson.com. Tel.+251911692242
- Haytham Mostafa, Program manager-Access area Ericsson Egypt LTD., Email haytham.mostafa@ericsson.com. Tel. +20111120135
- Ahmad Badr, Costumer project manager Ericsson Egypt LTD., Email ahmed.xx.badr@ericsson.com. Tel. +20111120290
- Roger Antoun, Costumer project manager Ericsson Lebanon, Email roger.antoun@ericsson.com. Tel. +96170120316
Employer:
Ericsson Egypt Ltd.
Job Title:
Project rollout coordinator
Start Month/Year:
07/2008
End Month/Year:
07/2009
City:
Cairo
Country:
Egypt
Description:
Not Specified
Employer:
Ericsson Egypt Ltd.
Job Title:
2G/3G implementation engineer/supervisor
Start Month/Year:
03/2007
End Month/Year:
07/2008
City:
Cairo
Country:
Egypt
Description:
Not Specified
Employer:
Exi Saudi Arabia Novia COM
Job Title:
System engineer
Start Month/Year:
09/2005
End Month/Year:
03/2007
City:
Riyadh
Country:
Saudi Arabia
Description:
Not Specified
Education Level:
Master's Degree
School Name:
National technical university-Kharkov state polytechnical university