GSM Rollout Experience
Experience on ZTE Equipment
Experience on Alcatel Equipment
Experience on Ericsson Equipment
Contact Information
Please log in to see contact information!
CURRICULUM VITAE
Profile
Education
2007 on going
Masters in Telecommunication
Iqra University Of Engineering & Technology, Karachi, Pakistan.
Jan 2000 Dec 2003
Bachelors Of Science in Electronics Engineering
Sirsyed University Of Engineering & Technology, Karachi, Pakistan.
Career History
Ericsson Vietnam Company Limited
Apr 2009 Feb 2010
RAN/TRAN Production Coordinator
Worked as RAN/TRAN Production Unit Coordinator on massive rollout of 841
Sites on Vietnam Mobile GSM Project. Main responsibilities are
Member Ericsson Project Management Team ( PMO )
Do telecom resource managing and planning for Zone.
Responsible to plan & execute Telecom part based on monthly & weekly targets.
Technical Coordination with Radio Access Network Implementation Team for the BTS & TRM. Implementation.
Responsible to prepare the monthly material forecast based on inputs from TND & RND.
Scheduling & Managing Daily implementation Progress
Providing Technical Assistance to my team members regarding installation. commissioning , Integration , trouble shooting and to complete process
Having strong knowledge about RBS & transmission Equipment.
Coordinate between all other departments ( TND , RND , TRAN , Civils & Sitacq ) for the successful & smooth rollout
Supervising IE Supervisor regarding preparation of SID, SMRs and SDD.
Ericsson Pakistan (Pvt) Ltd
Nov 2007 Apr 2009 RAN Implementation Coordinator
Successfully managed network roll out of more than 1175 GSM cell Sites in southern part of Pakistan for CMPAK ZONG ( CHINA MOBILE )
My responsibilities includes dealing with the Customer (CMPAK) For implementation of BTS & Access transmission and Assigning implementation call of to different service providers /Sub-contractors,
Project planning, I am involved in the implementation of project from the beginning till the closing of project, working as a project support member to the Project Manager.
Technical Coordination with Radio Access Network Implementation Team for the BTS & TRM. Implementation.
Implementation status monitoring and support.
Assigning tasks to team members and taking feed back.
Coordination with the Transmission Network Design Department regarding Transmission Implementation Issues in Transmission Network Design, MUX Plan and Path Qualities.
DCN, IP Addressing Scheme Implementation for wireless network.
Preparing daily, weekly and monthly Reports showing BTS and TRM. Implementation Status.
Provide rectification in MUX Plan, if needed for Channel Allocation and Traffic Routings in MS Office Visio.
Assigning tasks to Authorized Service Providers.
Needs to go on RBS Site for the rectification of faults, troubleshooting and commissioning of RBS 2216/2116and MINI-LINK Traffic Node 3.0 System using MINI-LINK Craft Tool.
Survey on sites with Implementation Engineering team for the solution of Installation Issues.
Involved in preparation of MUX Plan, Nominal Transmission Diagram and RBLTs assignments in coordination with the Transmission Network Design Department.
Integration and commissioning of Ericssons RBS 2216 / 2116 / 2106 / 2206/ 2107 / 2207 using OMT
Transmission Systems
Implementation of DCN Visibility of network to access the network remotely.
ODF panel distribution for STM from MSC end and from ADM sites through metro fiber ring.
Making Cross connection in different traffic nodes according to the MUX plan and Transmission diagram
Clear the transmission thorough Mini-Link.
Configure the NPU cards for new Traffic node sites
MINI-LINK CRAFT Traffic Node configuration and troubleshooting with AMM-2P , 6P and 20P Magazine configuration for 2 to 63 E1 capacity requirements.
Le BLANC COMMUNICATION PAKISTAN
Jan 2007 Aug 2007 Project Coordinator Sitacq , Civil & telecom
Monitoring systems, tracking progress and reporting updates while keeping deadlines in perspective
Coordination with the subcontractors and client for schedule monitoring and implementation of parallel activities to avoid time constraints
Oversee all the problems, solutions and multi task activities to follow up my subordinates working in different stations.
Development of work plans and managing the team and resources.
Attend meetings with the Customers for the valuable implementation & to
synchronize Sub cons with the changes occurring into the project along with
The Ease & maintaining the Quality of work.
Nov 2005 Dec 2006 Team Leader Telecom
To On-Air the site as per specification of PAKTEL.
Installation, commissioning, testing & troubleshooting of Ericsson MINI-LINK Traffic Node (TN) PDH Microwave System protected & un-protected both.
Installation, configuration, testing & troubleshooting of ZTE BTS ZXG 10 and Rectifier.
Installation, commissioning, testing & troubleshooting of ALCATEL AWY 9400 protected & un-protected both.
To prepareSMR & BOQ Bill of Quantity for each site a per design.
Conducting ATPs (Acceptance Test Procedures) with the customer for the BTS sites.
Responsible for coordinating/technical assistance with logistics for deployment of BSS equipment on site.
Teams mobilization, Office Management and Coordination with the Customer and different Subcontractors.
Fault Diagnosis & trouble shooting on different site and provide technical assistance to juniors.
Installing and configuring of different alarms on sites and integration with BSC.
Myson Engineering Systems (MES), Local Vendor of NEC (Japan) and ERICSSON
Mar 2004 Oct 2005
Team Leader
Mobilink Project
Installed and Commissioned NEC PDH (4E1, 8E1, 16E1), for Mobilink.
Operating PNMT (Paso link Network Management Terminal) & NMS (Network Management Systems) .
Warid Telecom Phase I & II Project
Coordinating all activities regarding installation, survey and testing with customer.
Installation and Commissioning of ERICSSON RBS 2206, 2207, 2106.
Installation of MiniLink and traffic node for Warid Tel.
Operating OMT for Alarm defining and MSM 6.3 for MiniLink.
Operating Site Master and VSWR Meter using Bird Analyzer ver. 3.0 and Antrisu.
Cascading of RBS 900 to DCS 1800 MHz.
Coordinating for LOS with Ericsson.
Site Investigation survey (IE) for Warid telecom with Ericsson, Preparing SID, SIR, and SDD for phase I & II.
Drive testing of Warid Telecom cell sites using TEMS.
Operating PNMT (Paso link Network Management Terminal) & NMS.
Trainings & Courses
Complete Training of Installation and commissioning of Alcatel new microwave family 9400 AWY at ALACTALE head office Islamabad Pakistan
Complete Training of Installation and Commissioning of ZTE BTS ZXG 10 at ZTE office Karachi
WCDMA RAN Node B commissioning training at Ericsson Lahore Pakistan
GSM BSS 07 2X16 Maintenance training at Ericsson Lahore Pakistan
CPP Certification program for GSDC - CPP Certification for GSDC
Ericsson PROPS R4 Interactive course
Introduction to PROPS-C
Organizational Management (TBM)
Six Sigma - the powerful change engine
The Service Delivery Maturity Model 2.0 SDMM
VDSL2 - High Performance Broadband Access
Site Development
GSM Earning & Efficiencies
Ericsson Windows Vista
Software and Tools
MINI-LINK Service Manager 6.3.4
Local Maintenance Terminal 34_9
MINI-LINK High Capacity Alcatel 1320 CT
Anritsu Hand Held Software Tools V6.58
BER Tester ( PUMA 4200 )
TEMS
Employer:
Ericsson Vietnam
Job Title:
RAN/TRAN PU Coordinator
Start Month/Year:
04/2009
End Month/Year:
02/2010
City:
HCMC
Country:
Vietnam
Description:
Worked as RAN/TRAN Production Unit Coordinator on massive rollout of 841
Sites on Vietnam Mobile GSM Project. Main responsibilities are
• Member Ericsson Project Management Team ( PMO )
• Do telecom resource managing and planning for Zone.
• Responsible to plan & execute Telecom part based on monthly & weekly targets.
• Technical Coordination with Radio Access Network Implementation Team for the BTS & TRM. Implementation.
• Responsible to prepare the monthly material forecast based on inputs from TND & RND.
• Scheduling & Managing Daily implementation Progress
• Providing Technical Assistance to my team members regarding installation. commissioning , Integration , trouble shooting and to complete process
• Having strong knowledge about RBS & transmission Equipment.
• Coordinate between all other departments ( TND , RND , TRAN , Civils & Sitacq ) for the successful & smooth rollout
• Supervising IE Supervisor regarding preparation of SID, SMR’s and SDD
Employer:
Ericsson Pakistan
Job Title:
RAN Implementation Coordinator
Start Month/Year:
12/2007
End Month/Year:
04/2009
City:
Karachi
Country:
Pakistan
Description:
RAN Implementation Coordinator
Successfully managed network roll out of more than 1175 GSM cell Sites in southern part of Pakistan for CMPAK ZONG ( CHINA MOBILE )
• My responsibilities includes dealing with the Customer (CMPAK) For implementation of BTS & Access transmission and Assigning implementation call of to different service providers /Sub-contractors,
• Project planning, I am involved in the implementation of project from the beginning till the closing of project, working as a project support member to the Project Manager.
• Technical Coordination with Radio Access Network Implementation Team for the BTS & TRM. Implementation.
• Implementation status monitoring and support.
• Assigning tasks to team members and taking feed back.
• Coordination with the Transmission Network Design Department regarding Transmission Implementation Issues in Transmission Network Design, MUX Plan and Path Qualities.
• DCN, IP Addressing Scheme Implementation for wireless network.
• Preparing daily, weekly and monthly Reports showing BTS and TRM. Implementation Status.
• Provide rectification in MUX Plan, if needed for Channel Allocation and Traffic Routings in MS Office Visio.
• Assigning tasks to Authorized Service Providers.
• Needs to go on RBS Site for the rectification of faults, troubleshooting and commissioning of RBS 2216/2116and MINI-LINK Traffic Node 3.0 System using MINI-LINK Craft Tool.
• Survey on sites with Implementation Engineering team for the solution of Installation Issues.
• Involved in preparation of MUX Plan, Nominal Transmission Diagram and RBLT’s assignments in coordination with the Transmission Network Design Department.
• Integration and commissioning of Ericsson’s RBS 2216 / 2116 / 2106 / 2206/ 2107 / 2207 using OMT
Transmission Systems
• Implementation of DCN Visibility of network to access the network remotely.
• ODF panel distribution for STM from MSC end and from ADM sites through metro fiber ring.
• Making Cross connection in different traffic nodes according to the MUX plan and Transmission diagram
• Clear the transmission thorough Mini-Link.
• Configure the NPU cards for new Traffic node sites
• MINI-LINK CRAFT Traffic Node configuration and troubleshooting with AMM-2P , 6P and 20P Magazine configuration for 2 to 63 E1 capacity requirements.