Main page
Preview 3g resume

Telecommunication Engineer

Resume keywords summary: Telecommunication, Engineer

Contact Information

Please log in to see the contact information!

Work Experience

Experience level: 5-10 years
Profile/Cover Letter: Highlights of Qualifications
Excellent supervision for roll out projects in 2G, 3G and 4G
Hands on experience site survey, planning and optimization
Commissioning, Integration and testing of eNode B, Node B, Radio Base Station/Base Transceiver Station and transmission equipments (PDH, SDH, Fiber and copper)
Extensive knowledge in operation and maintenance of eNobe B, Node B, Radio Base Station/Base Transceiver Station and transmission Equipments (PDH, SDH, Fiber and copper)
Experience in preparation of fiber closures, splicing and testing of 12, 72, 144, 288, 576 core ribbon fibers

Vendor and Technology Experience
ERICSSON MARCONI MDRS 155 LH (SDH) and ERICSSON OMS 1200/1600 series
CERAGON FIBEAIR (1500T and 3200P) and ECI mux (XDM - 100)
ERICSSON RBS 2000, 3000 and 6000 Family
IBS and repeater system
ERICSSON MINI LINK TRAFFIC NODE (2p, 6p and 20p), Minilink - E 9202, Minilink - E TMR 9202
Huawei BTS3900L, 3900A, RTN 620, 920 and 950
NSN Flexi Multi Radio BTS, Nokia Flexihopper and NERA Compactlink
Alcatel Evolium, Lx/Ux 9400
Siae alplus2 and alcplus2
Tellabs 6325
Eltek Valere, Emerson PS48300/30 and AcBel Rectifiers
Andrew and Argus equipments
Asoka router and modem for broadband over power line networking

Work Experiences

1. Company Servicestream Essential Network Services
42 Adams Drive Welshpool, Western Australia, Australia
Position Fibre Technician
Date February 4, 2013 - present

Work Description

NBN project
Exchange, FDH, T-FAN, backhaul, multiports, closure splicing and testing of NBN roll out.
Preparation, splicing and testing of 12, 72, 144, 288 and 576 core ribbon fibres.
Splitter termination and also conduct fiber scoping.
Can read and interpret NBN designs.
Prepare documents (workbook both multiport and backhaul).
Participate in on-call roster.

2. Company Commtrend Construction Corporation
23 Sarmiento Street Tinajeros Malabon City Philippines
Position Site Engineer/Team Leader
Date November 2012 January 2013

Work Description

NSN Smart LTE Share
Supervise in installation of NSN FMR
Supervise swap out of version1 3G to new NSN FMR
Commissioning and testing of 3G/4G equipment
3G/4G RF Sharing activation for 2100/1800
Speedtest testing
Splitting common system configuration
Provide site survey
Assist in Pick up on NSN FMR warehouse and delivered on site
Provide Software upgrade, commissioning, testing and troubleshooting of NSN FMR and other equipment inside the shelter
Perform fiber patching/splicing from NSN FMR LTE equipment to ODF, Tellabs 6325 and ECI XDM 100/1000 and laying the fiber cable in the fiber tray
Perform troubleshooting of NSN FMR LTE equipment including the VPN network and locating the fiber cut using OTDR
Provide technical support in Wireless Telco Rigging
Provide documentation for installed equipments
PAT/FAT for installed site

Huawei Change out project (BTS and transmission) Globe Telecom
Supervise in installation of BTS 3900L, BTS 3900A and RTN 620, RTN 920 and TN 950 as per Huawei and operator standard
Assist in antenna alignment to achieve the desired RSL
Provide site survey for the proposed location of BTS 3900L, BTS 3900A and RTN 620, RTN 920 and TN 950 Provide Software upgrade, commissioning, testing and troubleshooting of BTS 3900L, BTS 3900A and RTN 620, RTN 920 and TN 950
Provide patching/cross-connection of E1, FE1 and fiber from new Huawei BSC to new BTS
Provide E1, FE1, fiber swinging of E1 from old NSN BSC to new Huawei BSC

3. Company VASP Group Pty Ltd (Under Edt Global)
2/20 Peel Road OConnor Western Australia, Australia
Position Team Leader
Date June 2012 Aug 2012

Work Description

OPTUS NOKIA LTE PROJECT
Supervise the installation of Flexi Modules (FSME, FRGP, FTLB) as per NSN configurations
Commissioning, Integration and testing of the installed Flexi Modules
Supervise in installation of fiber optic cable (Huber shuner) to RRU, Nokia Flexi Multi RadioBTS, telecommunication cabling both on rooftops and at heights, RET cables, TMA, MHA, antennas, RRU, Filters, HPA and termination of connectors and grounding kits
Conduct testing of feeder cable using site master to test the VSWR, return loss and locate faults if any
Clearing of snags

PHOENIX/CATALINA PROJECT
Supervise riggers in their installation and dismantling of equipments.
Change out of minilink E to minilink TN 4.4 including upgrade of E1, baseline and hardware
Change out of minilink E to siae alplus2 and alcplus2 including upgrade of E1, software and hardware
Perform E1 migration from newly installed equipment
Provide BER testing of newly installed equipment
Provide documentation on installed site

4. Company DIGITEL MOBILE PHILIPPINES. INC. (SUN CELLULAR)
GCC Bldg. EDSA Cor. Ortigas Ave. Quezon City, Philippines
Position Operation & Maintenance Engineer Cagayan, Nueva Vizcaya, Quirino, Ifugao, Kalinga and Apayao
Date 2006 2012

Work Description
Team leader, Manages 7 persons in my group
Excellent in task scheduling of each member in my group.
Response in critical, major, minor outages and faults in BTR/RBS, transmission and BSC.
Performs preventive maintenance of BSC, BTS/RBS and BSC to prevent outages and report any fault arises if any on both telecom equipment and facilities.
External alarms termination and troubleshooting such as AC mains, rectifier, fire, intrusion, water, ACU fault, high temperature, genset on load, genset fault and rectifier fail alarms.
Knowledgeable in troubleshooting solar power and generators such as FG Wilson, indentra, Cummins, Denyo, Weichai, Powercity, Isuzu Foton, Kipor, Robin and Subaru
Also monitors the diesel level on bulk tank on site with generator.
Conduct LOS survey for the proposed new site project using path loss 4.0/5.0 and suggest the link for new site to minimize the CAPEX/OPEX.
Handle Ericcson (BSC, RBS, transmission), marconi, Oms 1200/1600 series, XDM 100/1000, alcatel (BSC, BTS and transmission), ceragon (SDH and PDH), nokia flexihopper, nera compack link, and huawei (BTS, transmission and synchronization)
Supervise installation and swap out of various BTS and transmission in accordance its standard.
Commissioning and testing/troubleshooting of RBS (2116, 2116v2, 2216, 2216v2, 6102, 6101 and 6201), Mini link Traffic Node (2p, 6p and 20p), Minilink - E 9202, Minilink - E TMR 9202, Marconi 155EC LH, Ceragon FibeAIr (1500T and 3200P), Nokia Flexihopper, Nera Compactlink, Oms 1200/1600 series and XDM 100/1000, Alcatel Evolium, Alcatel Lx/Ux 9400, Huawei RTN 620 transmission IBS, repeater system, ACbel, Emerson and Eltek Valere rectifiers.
Hands - on in fiber optic splicing testing and fault finding using OTDR.
Perform hardware and software upgrade of RBS (2116, 2116v2, 2216 and 2216v2) from single cabinet to double cabinet to increase subscriber capacity.
Perform hardware, software and E1 upgrade of PDH and SDH transmission
Supervise E1 migration from BSC to BSC, PDH to PDH, PDH to SDH and SDH to SDH.

Supervise Contractors

GM Maningas construction
Smart Modernization Project (Smart-Sun Cellular Collocation)
Date February June 2012
Survey for the location of the proposed location of RBS 6000 including panel/microwave antenna and Minilink TN 4.4
Installation, commissioning and testing of RBS 6000 and Minilink TN 4.4 on collocated sites
Perform the panoramic view every 30 degrees
Make recommendation for the benefit of the project

Jezka Construction
DMPI Phase 4 project (Huawei Node B and Transmission change out project)
Date November December 2011
Survey the location of panel and microwave antenna, RRU, BBU, RTN, length of fiber optic, length of feeder cable, length of power cable and length of IF cable to be used
Perform the panoramic view every 30 degrees
Make TSSR (Technical Site Survey Report)
Make recommendation for the benefit of the roll - out

Living @ Sense Inc.
DMPI PHASE 8B NEW SITE PROJECT
Date December 2009 February 2011

Installation, commissioning and testing of Ericsson mini link traffic node 1+0 protection mode (11 sites)
Installation, commissioning and testing of Ericsson mini link traffic node space diversity (1 site)
Antenna installation 0.6 m, 1,2m, 1.8m and 2.4 m in diameter.
Installation and commissioning of Ericsson RBS 2216 and 2116 family.
Installation and commissioning of Eltek Rectifier.
Patching and testing of E1 from BSC to link up of new site with different transmission equipment.
Perform E1 traffic routing.
Transmission upgrade for existing site.
Perform BER testing in the hop for 24 hours.
Testing of RBS sector antennas and feeder system with Site Master for fault isolation.
Panning of microwave antennas for maximum RSL in order to maintain integrity of transmission hops.
Fault clearing if necessary
Prepares documents for site acceptance.
Commissioning and troubleshooting of DCN on Mini-link Traffic Node.
External alarms termination and troubleshooting such as AC mains, rectifier, fire, intrusion, water, ACU fault, high temperature, genset on load, genset fault and rectifier fail alarms.
Install waveguide and IF connector termination in accordance to ERICSSON and DMPI standard.

REI
DMPI PHASE 8B UPGRADE PROJECT
ERICSSON RBS UPGRADE 2216 and 2216v2
Date January 2010 December 2010

Installation, commissioning and integration of 2nd cabinet
Perform E1 patching or cascading depending on the design
Perform E1 Traffic routing.
E1 patching from BSC to site.
Testing of RBS sector antennas and feeder system with Site Master for fault isolation.
Perform BER testing of E1 for 24 hours

ERICSSON Mini-Link Traffic Node Capacity Upgrade
Upgrade of MMU 2B, 2C and 2D
Software baseline upgrade
Perform traffic routing
Perform 24 hour BER testing

Ericsson Philippines
Commtrend Construction Corporation
DMPI TRANSMISSION CHANGE OUT PROJECT
From ALCATEL transmission to Ericsson Mini Link Traffic Node
Date July 2009 November 2009

Installation, commissioning and testing of Ericsson mini link traffic node 1+0 protection.
Installation of antenna system.
E1 patching from BSC to site.
Laying of IF cable
Perform E1 Traffic routing
Performs BER testing in the hop for 24 hours.
Software baseline upgrade.
Dismantling of alcatel transmission.

5. Company RGMA NETWORK INC.
Tuguegarao City
Position Broadcast Technician
Date Apr 16, 2005 - Jun 19, 2005

Work Description
Operation and maintenance of 10000 watts FM transmitter.
Monitor and maintain the output power of the transmitter by recording every hour the values in the different meters.
Set up of the two way radio for special coverage/activities
Operate generator during power interruption
Ensure that the computers and networks are working properly.
Assists the DJs in the operation of the console, software and computers.


Trainings
Certificate III in Telecommunications Cabling (ICT30310)
September 5 October 28, 2011
Conducted by Milcom Communications PTY LTD RTO
Open Registration Course (ICTCBL2136A and ICTCBL2137A)
September 12 16, 2011
Conducted by Milcom Communications PTY LTD RTO
Structured Cabling
July 8 9, 2011
Basic Management Training
June 22 24, 2011
Conducted by Digitel Mobile Philippines Inc.
Ericssons RAN Signaling
May 5 9, 2009
Conducted by Ericsson Philippines
Ericssons Microwave Networks System Survey
January 21 23, 2009
Conducted by Ericsson Philippines
Sun Cellular Technical Training
July August 2008
Conducted by Digitel Mobile Philippines Inc.
Ceragon Training ( 1500T)
March 29 30, 2008
Conducted by Ceragon Philippines
Ericsson Mini Link Traffic Node Training
October 9 12, 2007
Conducted by Ericsson Philippines
Eltek Familiarization Training
August 2007
Conducted by Eltek Valere Philippines
ETC.

Test Equipment and Software/Planning Tool Proficiency
Minilink Craft Terminal 1.1/2.0/2.2/2.4/2.5/2.6/2.7/2.8/2.11
NOKIA HOPPER MANAGER 4.0
ELTEK Winpower silver 3.0/4.1/4.2
NECTAS/ WINVENT
BTS manager
LMT/LCT (Marconi and OMS)
Ceraview 2.24
Hyperterminal
Ericsson OMT Series
Ericsson MiniLink Manager
BFTP Server
Huawei Synlock
Pathloss 4.0/5.0
MapInfo Professional 6.0
Anritsu S331D Site Master Antenna and Cable Analyser
TEKTELSCOUT TS100 (TDR)
Hewlett- Packard HP37721A BER Tester
Sunrise Telecom BER Tester F2H
Optical power meter
Garmin 12L GPS
OTDR (Siemens, ANDO, Anritsu, Hewlett Packard & Agilent, EXPO FTB 200,JDSU MTS 600)
FOC Fusion Machine (Fujikura 30S,50S & 60S)

Education
Cagayan State University
Bachelor of Science in Electronics and Communications Engineering
Tuguegarao City
March 2003

Personal Data
DATE OF BIRTH April 30, 1981
CITIZENSHIP Filipino
SEX Male
LANGUAGE SPOKEN English, Filipino
Passport Number EB2753066
457 Visa Number (Australia) 8099515948255 valid until 12 March 2016
Electronics Engineer License No. 0031496 acquired last November 2003 with a rating of 80.25%
Drivers License No. B04 01 050405

References
Available upon request

 
Employer: VASP PTY LTD
Job Title: Team Leader
Start Month/Year: 06/2012
End Month/Year: 08/2012
City: O'connor
Country: Australia
Description: OPTUS NOKIA LTE PROJECT
 
Employer: Digitel Mobile Philippines Inc.
Job Title: Supervising Engineer
Start Month/Year: 11/2006
End Month/Year: 06/2012
City: Quezon City
Country: Philippines
Description: Work Description
• Team leader
• Manages 7 persons in my group.
• Working for more than 5 years in Ericcson (BSC, RBS, minilink traffic node), marconi, alcatel, ceragon, nokia, nera, huawei equipments.
• Experience in installation, commissioning and testing/troubleshooting of RBS (2116, 2116v2, 2216, 2216v2, 6102, 6101 and 6201), Mini – link Traffic Node (2p, 6p and 20p), Marconi 155EC LH, Ceragon FibeAIr (1500T and 3200P), Nokia Flexihopper, Nera Compactlink, Oms 1200 series and XDM – 100, Alcatel Evolium, Alcatel Lx/Ux 9400, Huawei RTN 620 transmission IBS and repeater system
• Experience in installation, commissioning and troubleshooting of Alcatel ACbel, Emerson and Eltek Valere rectifiers.
• Knowledgeable in fiber optic and copper communication.
• Knowledgeable in fiber optic splicing and fault location
• Perform upgrade of RBS (2116, 2116v2, 2216 and 2216v2) from single cabinet to double cabinet to increase subscriber capacity.
• Perform software upgrade of RBS 2116, 2116v2, 2216, 2216v2, 6102, 6101 and 6201.
• Perform transmission upgrade from 2p to 6p, from 6p to 20p, capacity upgrade (LTU and MMU2B, 2C, 2D and up), software baseline and RAU upgrade.
• Supervise installation, commissioning and testing including termination of different equipment by different contractor in accordance to ERICSSON and DMPI standards.
• Supervise in upgrade from 1+1 to 2+1 and 2+1 to 3+1 respectively on Ericsson Marconi MDRS 155 LH and Ceragon SDH (1500T and 3200P)from 4+0 to 7+0 ring network and additional add/drop of XDM - 100
• Supervises waveguide and IF connector termination and dehydrator in accordance to ERICSSON and DMPI standards.
• Supervises swap out of alcatel equipment both BTS, transmission and BSC to ericsson equipment.
• Supervise E1 migration from Alcatel BSC to Ericsson BSC.
• Perform migration of PDH solution to Marconi MDRS 155EC LH with total of 41 sites and PDH solution to Ceragon FibeAir 3200P with total of 24 sites.
• Supervise contractor in survey of new GSM sites, Huawei Node B sites and transmission change – out
• Perform E1 patching and testing from BSC to RBS with different equipments.
• Perform E1 cascading of RBS 2116, 2116v2, 2216, 2216v2, 6102, 6101 and 6201 and IDB commissioning.
• Performs preventive maintenance on site to prevent major outages and report any fault arises if any on both telecom equipment and facilities.
• Knowledgeable on IP networks.
• Knowledgeable on fiber networks.
• Configuration and troubleshooting of DCN Ethernet parameter on Mini-link Traffic Node.
• External alarms termination and troubleshooting such as AC mains, rectifier, fire, intrusion, water, ACU fault, high temperature, genset on load, genset fault and rectifier fail alarms.
• Clearing of fault tickets on both RBS and transmission
• Monitors and troubleshoot all facilities such as generators controllers etc.
• Also monitors the diesel level on bulk tank on site with generator.

Background and Experience

 
Education Level: Bachelor's Degree
School Name: Cagayan State University
Major: Electronics and Communications Engineering
City: Tuguegarao City
Country: Philippines
Graduation Date: 31/03/2003
Description: passed

Languages

Language Level
English Intermediate

Job Preferences

Job Category: Telecom Implementation TI Jobs
Job Type: Any Job Type
Job Status: Immediate
Desired Salary: $0 Unspecified
Desired Location: any location
Willing to Relocate: Yes


URL of this page: http://www.3gwirelessjobs.com/web/resume/printpreview/48786
print page