Main page
Preview 3g resume

ERICSSON UMTS/GSM RAN TRAN FIELD ENGINEER

Resume keywords summary: RAN Performance Engineer - 2G and 3G ,commissioning engingeer, ericsson engineer, RBS integrator, transmission engineer, Mini link TN expert engineer, RAN/TRAN engineer

Contact Information

Please log in to see the contact information!

Work Experience

Experience level: 5-10 years
Profile/Cover Letter: HIGHLIGHTS OF QUALIFICATIONS

Good working knowledge and understanding of UMTS and GSM Networks.
Performed Ericsson RBS/TRM Integration, supervision, commissioning and installation.
Performed Supervision, Installation, ommisioning and Integration of RBS 3206,3106, 2216,2206,2111 ericsson cabinet.
Performed Integration and installation UMTS RBS 6000, 3206 & 3106 cabinet ( AT&T 3G network).
Performed RBS 3206,3106 Integration, script loading P7 basic and software upgrade procedure on site W11A new release ideally R1V14 / R2B03.
Handling Node B health Check and alarm handling occurrence on site and LKF loading.
Handling Board expansion for 2nd and 3rd carrier
Performed Integration and Installation of RBS 6601
Handling installation and commissioning Minilink TN (20P/6P/2P).
Supervising installation of Feeder /IF cable and mounting of GSM panel and Microwave Antenna from design azimuth and orientation.
Performed Quality Check after installation, like proper sealing of connectors between jumpers and feeder, and IF microwave connector for outdoor and indoor installation.
Perform Sweep testing (VSWR) measurement after feeder installation using Anritzu site master and BER during signalling test prior to integration.
Experience troubleshooting E1/T1/Microwave/Fiberlink transport.
Responsible for testing, troubleshooting and maintenance of Radio Base Stations and associated peripherals for GSM networks, Network upgrades of dtru swap and change.
Routing 2G/3G traffic through trunks & circuits through the following nodes Mini-link TN, Mini-link HC and Mini-link E Classic.
Perform Tellabs DXX ADM provisioning via NMS End to End testing & fault finding.
Performed Switch Node Tellabs DXX ADM 6300 STM1 CWOs KLM x-connection and End to End Testing .
Performed Installation & Commissioning of Nokia Flexi-Hopper MW .
Installation, Supervision and commissioning of Nokia WCDMA FlexiBTS, UltraSite Supreme and Optima Compact
Conduct E1 Transmission swapping/migration from Harris & PCOM/Lucent IDUs to Nokia Flexi-hopper.
Performed Cisco Catalyst Switches and Routers installation and commissioning (CISCO Routers 7200,3600,2600,2500,1600,800 / Cisco Catalyst 3750 Metro series, 2924,1924).
Installed and comcissioned Customer Premises Equipment, like Lucent cellpipe and copper mountain copper rocket router and modem for customer internet services.
Solid working experience of IP distribution, IP Routing including RIP, OSPF, BGP, MPLS, MPLS-VPN.
Good understanding with IPv4 and TCP/IP/UDP, Troubleshooting IP Network and design issues
Advance understanding of serial cabling and console connectivity
Strong Skills on TCP/IP addressing, LAN/WAN, networking and data communication.



WORK EXPERENCE DETAILS


Title UMTS INTEGRATOR / INSTALLER
Company GW communications LLC
Working for PARSON
Date March Present 2011

- Performed Integration and installation UMTS RBS 6000, 3206 & 3106 cabinet ( AT&T 3G network).
- Performed RBS 3206,3106 Integration, script loading P7 basic and software upgrade procedure on site W11A new release ideally R1V14 / R2B03.
- Handling Node B health Check and alarm handling occurrence on site and LKF loading.
- Handling Board expansion for 2nd and 3rd carrier






Title RAN/TRAN Field Coordinator
HTC/HTVN E-GSM Project
South (Ho Chi Minh City)
Company Ericsson Vietnam Company Ltd.
Date October 2008 April 31, 2010 // November 29, 2010 January 7, 2011

- Supervise the Installation of RBS(2216,2111), Minilink TN(20P,6P ,2P) and Delta Power Cabinet and Commissioning of Ericsson RBS 2216/2111 and Ericsson Mini-link TN(20P,6P,2P) prior to integration which is done by Field Coordinator itself.
- Commissioning, Create Traffic routing, testing, troubleshooting and clear the alarms of MiniLink TN using MiniLink Craft 2.2
- Monitoring the status & the quality of the production of ASP.
- Carry out instructions to subcontractor with Ericssons standard and workmanship manner.
- Responsible for ASPs work Installation on daily basis, quality audit and progress reporting directly to PU(Production Unit) for site handler update.
- Supervise implementation activities of ASPs from NORTEL BTS to ERICSSON RBS 2216 swap-out for HTC Vietnam.
- Timely monitoring reports like TSSR,SID,SDD during implementation and acceptance readiness.
- Performed Antenna system test using Anritzu/Bird Site Master prior to integration.
- Perform Site Quality Audits for sites Integrated prior to rectification to be ready for PAT.




Title RAN/TRAN Engineer / Tester
Company EXi Saudi Arabia Limited (NOVIACOM )
PO Box 57147 Riyadh11574 Kingdom of Saudi arabia
Date October 2007 August, 2008

- Performed migration and shifting of traffic from MiniLink 15 E to TN 20P (STCs Central Network 600 sites)
- Performed migration and shifting of traffic from MiniLink 15-E to TN 20P (STCs Network 600 sites).
- Supervise Installation & Commissioning of Ericsson RBS 2216/2206 and Ericsson Mini-link TN,HC & 15E for Mobily, ZAIN and STC Network Expansion.
- Installation and integration RBS 3206, RBS 2206 and upgrades of transmission of RBS.
- Performed installation and integration of RBS by powering up of RBS, checking E1, loading script files via EMAS, checking
- Performed Switch Node Tellabs DXX ADM 6300 STM1 CWOs KLM x-connection and End to End Testing .
ADM Routing 3G traffic through trunks & circuits through the following nodes Mini-link TN
- ADM Cabling connection between (TN, HC, MLE) and STC IT Routers (Ethernet Cable).- Installation of around 270 SAU IP cards (For collocated TN s & MLE s) - Adding all nodes to the Minilink Manager 7.2
- Creating the channelized STM-1s' trunks through the NMS between ATM8660 & DXX6300 nodes.
- Troubleshoot IP DCN related issues during implementation and cut over
- Perform Software upgrade for 2p/6p/20p Traffic Node
- Performed Installation & Commissioning of Nokia Flexi-Hopper MW .
- Performed Installation & Commissioning of Nokia 3G FlexiBTS NodeB .
- Nokia WCDMA FlexiBTS, UltraSite Supreme and Optima Compact
- Performed Handover and test call for 3G Network using NeMO Handy tools 1.70.
- Traffic Transmission Swapping/Migration from Harris & Lucent To Nokia Flexihopper.
- Perform Upgrade from 4E1 to 8E1 and changing ODUs and adding EXU Module 16E1.
- Installation and commissioning of Nokia Flexi Hopper transmission.
- Conduct MW alignment / Fine tuning of Nokia Flexi Hopper.
- Conduct PAT for STC 3G project on MW Nokia Flexi Hopper and WBTS Node B (Taif, KSA)
- Conduct Software Upgrade and Capacity upgrade of Nokia Flexi Hopper
- Perform VSWR and Distance to Fault Ratio Testing.
- Conduct PAT and OILS Clearing for STC 3G project on MW Nokia Flexi Hopper and WCDMA BTS.


Title O&M Team Leader
O&M Radio Access Network & Engineering
Company Digitel Mobile Philippines, Inc. (Sun Cellular)
Galleria Corporate Center, 110 Quezon City Philippines
Date June 2004 October 2007

24/7 Radio Base Stations (RBS/BTS) Network Operations and Maintenance,
Commissioning / Integration of RBS 2206/2216
Commisioning / Integration Minilink Traffic Node/ Classic E
Trouble-shoot related equipment by using relevant O&M software and terminals as well as external test instruments/tools/protocol analyzers and Change faulty H/W.
Handling spare parts and faulty equipment with care.
Ensures that detected problems are resolved within agreed timeframes, KPI s .
Resolve any H/W problem related to Radio, power, Transmission and peripheral devices.
Introduce software updates and do basic equipment, software and port configurations.
Maintains GSM Network Stability and performance and provide upgrades on capacity.
Maintain the Transmission stability and Performance and conduct Network traffic upgrade.
Troubleshooting and performed E1 End to End and cross-connection on DXX ADM 6320


Title Network Operations Supervisor
Implementation
Northern Mindanao August 2003- June 2004
Senior Network Engineer
Davao city Central April 2001 - August 2003
Company Dctech Micro Services, Inc
Davao City, Philippines
Services Internet Service Provider/ VAS provider / Computer dealer

Ensures that the deliverables meet client goals for design and performance
Works closely with wireless deployment teams and other engineering groups in identifying and resolving the problem.
Provides technical support from simple to complex issues coming from DSL and wireless clients (corporate & SOHO)..
Primary Duties include Supervision of installation, Commissioning, PCOM Encore S 16xE1 testing and E1 activation and alarm termination.
Primary duties include testing, commissioning and integration of SRTelecom SR 500.
Immediate assistance for technical problems resulting in corrective actions(including hardware or software upgrades performed by our certified technical representative)
Confirm on the field the map study done in the office. Confirm location of identified barangays by using GPS (Global Positioning System) and get the given coordinates
Recommendations regarding improvements to the network architecture or configuration to improve overall network efficiency and performance .
Training personnel to recognize and resolve field problems.
Involve planning and cost analysis.
Performs quality control and test procedures that conform to established project quality standards on assigned systems. Responsible for contributing to the achievement of the companys sales and collection objectives through selling, servicing, and the successful completion of other related sales duties.
Prepares and maintains reports and applicable records of network hardware and software inventory.
Manage the design, upgrade, and maintenance of onsite and offsite backup systems and redundancy to protect both clients and company from data loss.



Trainings / Seminars Attended

1 Ericsson Marconi MDRS LH 155EC Commissioning and Operation
ERICSSON PHILIPPINES
Patrick Go Bldg. Lapu-lapu cor. Legaspi Sts.
Cebu City, Cebu Philippines
October 5-9, 2007
2 GSM RBS 2116/2216 Maintenance Delta
ERICSSON PHILIPPINES
Net Square Building, Bonifacio Global City, Taguig Metro Manila Philippines
September 26, 2007
3 Mini-link TN Operation & Maintenance
ERICSSON PHILIPPINES
Net Square Building, Bonifacio Global City, Taguig Metro Manila Philippines.
October 2-5, 2007
4 Belden/CDT Structured Cabling
Waterfront Hotel
Cebu City, Philippines
August 15-20, 2005
5 PCOM MW Radio installation, commissioning and maintenance
Dctech Micros ervices Inc.
Ponciano Reyes St., Davao City Philippines
December 5-7, 2005
5 Motorola Canopy Wireless Internet Operation & Maintenance
Dctech Micros ervices Inc.
Ponciano Reyes St., Davao City Philippines
August 16-20, 2004
6 LAN / WAN / WLAN
DCTECH micro services Inc. Davao City, Philippines
December 1-15, 2003



Test Equipment and Software/Planning Tool Proficiency

Mini link craft V2.2
Nokia WBTS Site Manager
Nokia Flexi Hopper Manager
Tellabs 6300 craft/extended terminal
OMT (Operation & Maintenance Tool) for Ericsson BTS
SunSet E20c E1 BERT transmission testing
Anritsu Site Master 331D
Acterna E1 and Data tester


 
Employer: GW COMMUNICATIONS
Job Title: TELECOM ENGINEER
Start Month/Year: 03/2011
End Month/Year: Current
City: OKLAHOMA
Country: USA
Description: - Performed Integration and installation UMTS RBS 6000, 3206 & 3106 cabinet ( AT&T 3G network).
- Performed RBS 3206,3106 Integration, script loading P7 basic and software upgrade procedure on site W11A new release ideally R1V14 / R2B03.
- Handling Node B health Check and alarm handling occurrence on site and LKF loading.
- Handling Board expansion for 2nd and 3rd carrier
 
Employer: Ericsson Vietnam Company Ltd.
Job Title: RAN TRAN field supervision coordinator
Start Month/Year: 10/2008
End Month/Year: 01/2011
City: Ho Chi minh
Country: Vietnam
Description: - Supervise the Installation of RBS(2216,2111), Minilink TN(20P,6P ,2P) and Delta Power Cabinet and Commissioning of Ericsson RBS 2216/2111 and Ericsson Mini-link TN(20P,6P,2P) prior to integration which is done by Field Coordinator itself.
- Commissioning, Create Traffic routing, testing, troubleshooting and clear the alarms of MiniLink TN using MiniLink Craft 2.2
- Monitoring the status & the quality of the production of ASP.
- Carry out instructions to subcontractor with Ericsson’s standard and workmanship manner.
- Responsible for ASP’s work Installation on daily basis, quality audit and progress reporting directly to PU(Production Unit) for site handler update.
- Supervise implementation activities of ASP’s from NORTEL BTS to ERICSSON RBS 2216 swap-out for HTC Vietnam.
- Timely monitoring reports like TSSR,SID,SDD during implementation and acceptance readiness.
- Performed Antenna system test using Anritzu/Bird Site Master prior to integration.
- Perform Site Quality Audits for sites Integrated prior to rectification to be ready for PAT.

Background and Experience

 
Education Level: Bachelor's Degree
School Name: University of the Immaculate Conception
Major: Electronics & Communication
City: Davao City
Country: Philippines
Graduation Date: 24/03/2001
Description: Not Specified

Languages

Language Level
English Fluent

Job Preferences

Job Category: Ericsson Jobs
Job Type: Contract Job
Job Status: Flexible
Desired Salary: $0 Unspecified
Desired Location: Not Specified
Willing to Relocate: Yes


URL of this page: http://www.3gwirelessjobs.com/web/resume/printpreview/42655
print page