Main page
Preview 3g resume

Project Coordinator

Resume keywords summary: CV

Contact Information

Please log in to see the contact information!

Work Experience

Experience level: 10 +
Profile/Cover Letter: Name Manuel G. Tuangco Jr.
Address B7 L5 Celina Homes 2 Deparo Caloocan City
Contact Numbers 09396163509
Email mtuangco@yahoo.com, mtuangcoj@yahoo.com, mtuangco@hotmail.com

Highlights of Qualifications

To lead and co-ordinate all RBS/TRM implementation activities site investigation, site engineering, installation and testing & commissioning.
Perform Planning, Supervision & Implementation of ERICSSON Quality Standard.
Perform floor layouts and marking task.
Perform Outdoor Installation of Delta Cabinet.
Perform Installation, Commissioning, Testing, Integration of Radio Base Station.
Perform Integration, Testing, Commissioning of Node B, RBS 3000 (3G) WCDMA.
Perform fault handling, verifying the earthing and lightning protection, verifying C-Clamps.
Perform Test call, Air-Interface, Handover using 3G Test phone.
Perform Integration, Installation, Antenna, sharing of CDMA & WCDMA.
Perform basic setup of Mini-link E terminal configurations by entering configuration data from a site.
Perform Testing, Installation, of Antenna Filter for GSM (RBS 2000 & RBS 3000).
Perform loading and installing of Installation Data Base (IDB)
Perform Installation, Commissioning, Testing of Traffic Node
Perform Troubleshooting in RBS 2000 & RBS 3000.
Perform TRU and DXU upgrade (EDGE upgrade) single and dual band systems.
Perform loading and installing RBS software such as RBS2101,2102,2202,2106,2206, 2207.
Perform Operation and Maintenance of Radio Base Station
Perform loading, uploading of script data from site handler to Node B
Perform Installation, Commissioning, Integration of Minilink E
Perform Installation, Testing, Repair of G.E. & Shinwa 2way radio
Perform Installation, Testing, Repair of Telemobile radio
Perform Installation Testing of Dataradio Modem
Perform Installation, Repair, Testing of Yaesu 2 way radio

Vendor and Technology Experience

Ericsson RBS3206 Installation, Commissioning, Testing, Integration.
Ericsson RBS2000 Family Installation, Commissioning, Testing, Integration.
Ericsson Traffic Node Installation, Commissioning, Testing.
Ericsson Mini-link E Family Installation, Commissioning, Testing.
Ericsson RBS883, RBS889 ETACS Installation, Commissioning, Testing, Integration.
Ericsson RBS882 AMPS Installation, Commissioning, Testing, Integration.
Ericsson RBS884 D-AMPS Installation, Commissioning, Testing, Integration.
Ericsson DRA 1900 WLL Installation, Commissioning, Testing, Integration.
Work Experience

Company Ericsson Vietnam
Project VietnaMobile
Operator/Vendor VietnaMobile / Ericsson
Location Honoi, Vietnam
Date October 2008 to October 2009
Position Ran Roll-out Co-ordinator/Ran PU Co-ordinator

Responsibilities
Supervise Service Providers for the proper installation and commissioning of Ericsson RBS Radio Base Station RBS2216, RBS2111. Mini-Link TN Networks, Antenna system installation, Power System, Grounding System.
Make schedule for the deployment of Field Engineers for site installation and integration.
Provide material request to Logistics and coordinate with ASP for installation schedule and all issues pertaining to the project deployment.
Make material list for RBS, Power System, Mini Link TN equipment, and Antenna system.
Escalate/Monitoring & feedback to Regional Project Manager rollout of different civil issues popup during the TI.
Coordinate with Supervisors for progress update of his sites.
Escalate any issue or concern to Regional Project Manager which needs coordination with ASP management.

Company Ericsson Pakistan
Project PakTel Project
Operator/Vendor PakTel / Ericsson
Location Karachi, Pakistan
Date August 2007 to November 2007
Position RBS/TRM Regional Supervisor/Project Co-ordinator

Responsibilities
Routine progress monitoring of my region.
Coordinate with Supervisors for progress update of his sites.
Resolve the routine Technical issues popup during the rollout activities.
Monitor & insure the quality assurance of rollout sites.
Implement the strategy of rollout conveyed by the relevant in-charge in the project.
Report the routine progress to the concern Regional Implementation Manager.
Escalate the technical issue to the Regional Implementation Manager if, its of a nature of unsolvable or of matter of urgent.
Escalate the Quality related issues if, its a mater of urgent.
Escalate any issue or concern to Regional Implementation Manager which needs coordination with ASP management.
Coordinate with ASP on routine rollout issues/Escalate the Priority issues to Regional Implementation Manager level for the resolution of it on middle management level on urgent basis/Issue of critical nature can escalate to Manager level directly putting in loop.
RFI forecasting of my region in coordination with Regional Implementation Manager.
Escalate/Monitoring & feedback to Regional Implementation Manager rollout of different civil issues popup during the TI
Collect the SMR/SID from IE dept & distribute to the concern Supervisor of their sites.
Submit the SID document for SDD preparation.
For the delivery schedule of equipment with the coordination of AM
Missing equipment follow-up and report to the concerned Regional Implementation Manager
SRR submission.
Insure the proper documentation of all important data of the project with the help of DBC's

Company Gridcomm (Though EDT Global)
Project Telstra Project Jersey
Operator/Vendor Telstra/ Ericsson
Location Sydney NSW, Australia
Date June 2006 to March 2007
Position Ericsson WCDMA NODE B/RBS INTEGRATION Engineer

Responsibilities
Supervised the Installation, Testing, Integration of WCDMA 850 NODE B/RBS 3206
Supervised the Installation, Testing, Integration of RBS 2206
Cut-Over of RBS 200 to RBS 2206. Co-ordinate the TRANSMISSION TO RNC.
Loading of Script file via Element Manager.
Check and Verify the DEFAULT IP ADDRESS IN THE HYPER TERMINAL BEFORE LOADING THE SCRIPT.
Loading of O&M ACCESS Script and SITE EQUIPMENT Script
Check the HSPDA BOARD before continue to LOAD the SITE EQUIPMENT Script.
Loading of SPECIFIC IUB Script and STATUS OF DEVICE Script
Check the SOFTWARE REVISION
Check and Verify the IP ADDRESS IN THE HYPER TERMINAL AFTER LOADING THE SCRIPT. Defined the Alarm in the DXU
Perform a CV Backup file, Check status device
Check the CV CU and Check the CV LS
Make log file on PGLIST, CV LS, CV CU
Make a Test Call in RBS 3206 and Check the Scrambling Code
Check the External Alarm in Element Manager and log the file
Installation of Bandpass Filter in RBS 3206
Swing the Jumper cable of RBS 200 to RBS 2206
Sweptest the Feeder Cable RBS3206 & RBS 2206
Configured the TEI value in the IDB of the DXU in the RBS2206
Checked the DC Power of RBS 3206 & RBS 2206
Make a Test Call and Hand Over in RBS 2206.

Company Ericsson Pakistan
Project WaridTel Project
Operator/Vendor WaridTel / Ericsson
Location Islamabad, Pakistan
Date December 2004 to September 2005
Position RBS/TRM Regional Supervisor/Project Coordinator

Responsibilities
Responsible for the Supervision of Installation and Testing of GSM 900 & 1800 DUAL BAND indoor and outdoor cabinet of the Base Transceiver Station.
Create Plan in advance to Project the Flow and Movement of the Project Implementation. Attend the Project Meeting and discuss the Installation Issue, Missing Material Issue.
Perform Planning, Supervision, Coordination & Implementation to the Ericsson Supervisor, ASP & Sub-contractors for the site ready for installation, commissioning, integration, testing.
Time To Time Update Of BTS/TRM PROGRESS SHEET.
Coordinate to the BSC personnel in the time of integration and give the Site Information i.e. (the RBLT, BSC, SITE ID and SITE NAME.
Coordinate closely to the TND Transmission & to RND BTS Planning Department as well as the Project Solution I.E. Department for all necessary Sites Installations Documents for Sites needed.
Generally I am working all the activities as Interface to the RBS/TRM Regional Implementation Manager and Regional Project Manager Ericsson Islamabad Region.
Responsible to make a report to my Immediate Superior.
Coordinate to Ericsson Supervisors for the Daily Activities assigned to them.
Responsible for the integration of DUAL BAND SYSTEM RBS2207 & RBS2206.
Configure, Testing, Commissioning, of Mini-Link Traffic Node.
Coordinate to ASP Authorized Service Provider Local
Contractors of Ericsson for there Daily Activities as well.
Make a Test Call and Hand Over Test upon integration using TEMS.
Perform Time/Slot and Handover testing using TEMS phone. Defined the Alarm in the DXU. Test and Instal Ericsson BBS
Execute Leadership to all Ericsson Supervisors & Service Providers ASP.
Configured the TEI value in the IDB of the DXU in the RBS2106, RBS2206,
RBS2207, RBS2308.
Checked and measured the Commercial Power before power on the Base
Tranciever Station and Radio Base Station.
Monitor and manage retrieval of Daily Progress for Data update.
Supervised the ALARM CABLE color coding installation in the Distribution Frame.
Installed and checked the continuity of the fabricated PCM cable.
Supervised and checked the installation of Fiber Optic Cable.
Responsible for the UP GRADE of TRU. Testing and Simulate the alarm.
Preparing daily job activities to be implemented for all Ericsson Supervisors and for Local Contractor ASP. Responsible for the EXPANSION of BTS CABINET.
Calibrate the SITE MASTER & BIRD ANALYSER before TESTING of the feeder.
Testing of feeder and jumper cable by using Site Master & Bird Analyser.
Coordinate to the Regional Project Manager for Data Progress Report.
Measured and Checked the voltage output of RECTIFIER use in the TRAFFIC NODE. Measured and Checked the voltage output of DC/DC Converter.
Giving special guidelines and Instructions to Supervisors in the field incase problems arises as well as to Service Providers.
Coordinate to the Telecom. Operator Warid Telecom. Back Office Manager Operation & Maintenance Department for any request of Down Time Activities either by Day & Night time, incase of Job Rectifications or RBS & TRM Upgrading.
Test the Battery Back-up System of RBS 2202, RBS 2206.
Measured and Checked the voltage output of BFU & DFU.
Checked and Test the Optic Fiber in the BBS.

Company Ericsson Pakistan
Project WaridTel Project
Operator/Vendor WaridTel / Ericsson
Location Islamabad, Pakistan
Date July 2005 to August 2005
Position Acting RBS/TRM Regional Implementation Manager


Responsibilities
Coordinate implementation activities with service provider.
Coordinate with internal stakeholders.
Manage coordination of Ericsson supervisor.
Manage site implementation call off. Initialize Change Order handling.
Manage retrieval of progress data.
Report progress data to regional Project Manager and to interface within Radio Access Network.
Manage site equipment and material call off.

Company BOT-Broadband Indonesia
Project Telkomsel
Operator/Vendor Telkomsel / Ericsson
Location Medan, Indonesia
Date April 2003 to July 2004
Position RBS/TRM Supervisor

Responsibilities
Responsible for the Supervision of Installation and Testing of GSM 900 & 1800 indoor and outdoor cabinet of the Base Transceiver Station.
Testing, Commissioning, Cross-connect of Mini-Link.
Make a Test Call and Hand Over Test upon integration using TEMS.
Defined the Alarm in the DXU and Testing and Simulate the alarm.
Configured the TEI value in the IDB of the DXU in the RBS2202, RBS2206.
Checked and measured the Commercial Power before power on the Base.
Tranciever Station and Radio Base Station.
Supervised the ALARM CABLE color coding installation in the Distribution Frame.
Installed and checked the continuity of the fabricated PCM cable.
Supervised and checked the installation of Fiber Optic Cable.
Responsible for the UP GRADE of TRU.
Responsible for the EXPANSION of BTS CABINET.
Checked and Test the Optic Fiber in the BBS.
Calibrate the SITE MASTER before TESTING of the feeder.
Testing of feeder and jumper cable by using Site Master.
Measured and Checked the voltage output of DC/DC Converter.
Measured and Checked the voltage output of DFU.
Test the Battery Back-up System of RBS 2202, RBS 2206.

Company N.G. Telecom
Project Globe Project
Operator/Vendor Globe Telecom / Ericsson
Location Visayas & Mindanao
Date July 2001 to August 2002
Position RBS Installation Supervisor

Responsibilities
Responsible for the Supervision of Installation and Testing of GSM 900 & 1800 indoor and outdoor cabinet of the Base Transceiver Station.
Make a Test Call and Hand Over Test upon integration using TEMS.
Defined the Alarm in the DXU.
Configured the TEI value in the IDB of the DXU in the RBS2000.
Checked and measured the Commercial Power before power on the Base
Tranciever Station and Radio Base Station.
Supervised the ALARM CABLE color coding installation in the Distribution Frame.
Installed and checked the continuity of the fabricated PCM cable.
Programmed the alarm KEY PAD in the SWESITE.
Supervised and checked the installation of Fiber Optic Cable.
Responsible for the UP GRADE of TRU.
Responsible for the EXPANSION of BTS CABINET.
Calibrate the SITE MASTER before TESTING of the feeder.
Testing of feeder and jumper cable by using Site Master.
Measured and Checked the voltage output of DC/DC Converter.
Measured and Checked the voltage output of DFU.
Test the Battery Back-up System of RBS 2202.

Company Ericsson USA
Project Condor Project
Operator/Vendor Bellsouth / Ericsson
Location Atlanta, Georgia
Date February 2000 to February 2001
Position RBS TEST LEAD (Field Engineer IV)

Responsibilities
Supervised the Commissioning, testing and Integration of RBS 884.
Checked the T1 status and verified in the MSC.
Load the DT in the Radio Base Station.
Self test the Alarm Board and the RFTL.
Checked the RFTL Calibration.
Reset the STR, EMRPL, and the EMRPS before power on the CRI.
Checked the software version of the TRX.
Load the alarm definition.
Verified the status of the EM, STR, EMRPS, EMRS, RILTS.
Checked and Self-test the status of the TRX.
Make a Test Call in every MVC and MDVC.
Self test the CTC and the ATTCC.
Make a log file and save it to the disk.
Test the 1st and 2nd Control link.
Mentor / teach installation and testing to junior implementation personnel.
Acquire customer sign-off of acceptance / punch list.
Direct implementation field personnel in daily work.
Inform Project Manager and Implementation Manager of customer concerns /
complaint.
Responsible for the Supervision of Installation and Testing of RBS 2000
indoor and outdoor cabinet of the Base Transceiver Station.
Stand alone Test of BTS using (SATT) BSC Sim II.
Supervised and checked the antenna orientation using compass.
Checked the position of the antenna and equipment in the SITE BINDER.
Make a Test Call and Hand Over Test upon integration using TEMS.
Supervised and checked the installation of LABEL in all cables.
Defined the Alarm in the DXU.
Supervised and checked the installation of Fiber Optic Cable.
Supervised the ALARM CABLE color coding installation in the
Distribution Frame.
Responsible for the EXPANSION of BTS CABINET.
Calibrate the SITE MASTER before TESTING of the feeder.
Testing of feeder and jumper cable by using Site Master.
Configured the TEI value in the IDB of the DXU in the RBS2000.
Supervised & checked the Grounding installation indoor, outdoor.


Company Nokia Philippines
Project Smart Project
Operator/Vendor Smart Wireles / Nokia
Location Nationwide
Date August 1999 to December 1999
Position BSS Commissioning Engineer

Company Ericsson Network Philippines
Project Smart & Globe Project
Operator/Vendor Smart & Globe / Ericsson
Location Nationwide, Visayas & Mindanao
Date September 1995 to August 1999
Position RBS Implementation Supervisor 1

Responsibilities
Responsible for the Supervision of Installation and Testing of GSM 900 &1800
indoor and outdoor cabinet of the Base Transceiver Station.
Stand alone Test of BTS using (SATT) BSC Sim II.
Supervised and checked the antenna orientation using compass.
Checked the position of the antenna and equipment in the SITE BINDER.
Make a Test Call and Hand Over Test upon integration using TEMS.
Supervised and checked the installation of LABEL in all cables.
Defined the Alarm in the DXU.
Supervised the installation of ROXTEX in the cable inlet.
Supervised the installation of Cable Ladder in the Indoor and Outdoor.
Checked and measured the Commercial Power before power on the RBS.
Responsible for the SITE ACCEPTANCE TEST.
Supervised & checked the Grounding installation indoor, outdoor.
Supervised the ALARM CABLE color coding installation in the Distribution Frame
Installed and checked the continuity of the fabricated PCM cable.
Programmed the alarm KEY PAD in the SWESITE.
Supervised and checked the installation of Fiber Optic Cable.
Responsible for the UP GRADE of TRU.
Responsible for the EXPANSION of BTS CABINET.
Supervised and Checked the Smoke Alarm, Water, Temperature Alarm,
Aircon Alarm, Door Alarm in the SWESITE.
Calibrate the SITE MASTER before TESTING of the feeder.
Testing of feeder and jumper cable by using Site Master.
Configured the TEI value in the IDB of the DXU in the RBS2000.
Test the Aircon of RBS 2102.
Measured and Checked the voltage output of DC/DC Converter.
Measured and Checked the voltage output of DFU.
Supervised the installation of Battery Back-up System of RBS 2202.
Installation & Testing of Micro and Macro Radio Base (TACS SYSTEM).
Supervised the installation of feeder and connector.
Checked the assigned channel frequency in the TRU.
Supervised the installation of Radio Base Station 883 power cabinet.
Checked and measured the -48 VDC power of RBS 883.
Checked the indoor and outdoor grounding installation in the feeder.
Checked the Address plug according to the Cell Design Data.
Check the Transmitter line Level, Transmitter Offset, Power Output,
Transmitter deviation, Sat tone deviation, Tuned the receiver line level.
Checked the Receiver diversity sensitivity, and adjust the Squelch level.
Checked Rf level calibration and line loop gain test.
Align and adjust the combiner, Monitor the power output in the power.
Supervised and checked the D.T.F and V.S.W.R. of the feeder cable using T.D.R.
Company Easycall Communication Philippines
Location Galleria Corporate Center, Pasig City
Date October 1992 to August 1995
Position Senior Telecom Technician

Company Atronics Manufacturing Corporation
Location Penthouse Fortune Office Building
Date May 1992 to October 1992
Position Product Specialist

Company Dataradio Philippines
Location P. Burgos St. Makati City
Date June 1990 to March 1992
Position Service Engineer

Company Radionet Inc.
Location Pasong Tamo Ext. Makati City
Date April 1988 to May 1990
Position Technical Supervisor

Company Nation Broadcasting Corporation
Location NBC Broadcasting Center Guadalupe Makati City
Date June 1985 to February 1988
Position Radio Technician IV

Trainings Attended
Republic Broadcasting Corp.
Radio & TV Engineering Department
GMA Building EDSA, June 1984
Telemobile Trunking Radio
Philippine Telephone & Telegraph Company
PT&T Building, Aug. 1992
Radiolab VT-100 & VT-200
ERG Electronics Limited
Easycall Building, May 1993
Terrestrial Microwave and Heliax System Planning.
Andrew Corporation
Shangrila EDSA, March 1994
GSM/DCS Mobile Radio Repair and Service Strategy
Hewlett Packard
Shangrila Makati, June 1994
RBS 883 Commissioning & First Line Maintenance.
Perwira Ericsson Sdn. Bhd. Malaysia
Malaysia, September to October 1995
Microsoft Project V4.0
Mannasoft Technology Corporation
Peninsula Hotel, October 1995
CMS 8810 Systems Survey.
Ericsson Training Center
Ericsson Building, November 1995
Documentation
Ericsson Training Center
Ericsson Building, January 1996


Leadership One Training Programme
Ericsson Academy Malaysia Sdn. Bhd.
Malaysia, December 1996
CME 20 RBS 2000 Basics
Ericsson Radio System Stockholm Sweden
Sweden, December 1996
DRA 1900 WLL
Ericsson Training Center
Ericsson Building, February 1997
DRA 1900 System Function and Dimensioning
Ericsson Business Network AB, Sundbyberg Sweden
Sweden, April 1997
Fundamentals of Cellular Telephony
Ericsson Training Center
Ericsson Building, April 1998
On The Job Training ( RBS 2202, RBS 2102 )
Ericsson Taiwan Ltd.
Taiwan, July to August 1998
GSM RBS 2106/2206 Test & Maintenance Delta
Ericsson Knowledge Center, Jakarta Indonesia
Indonesia, June 2003
Delta Cabinet Outdoor Installation (ABA01, ABB01, ABC01)
Ericsson Vietnam Company Limited
Hanoi, Vietnam February 2009

Educations and Accreditations
Guzman Institute of Electronics
General Radio Communication Operator
Manila, April 1984
Feati University
Bachelor in Electronics and Communications Engineering
Manila, March 1989
Eligibility Certified Technical Education and Skill Development Authority



 
Employer: Ericsson Vietnam
Job Title: Production Unit Coordinator
Start Month/Year: 10/2008
End Month/Year: 10/2009
City: Hanoi
Country: Vietnam
Description: • Supervise Service Providers for the proper installation and commissioning of Ericsson RBS Radio Base Station RBS2216, RBS2111. Mini-Link TN Networks, Antenna system installation, Power System, Grounding System.
• Make schedule for the deployment of Field Engineers for site installation and integration.
• Provide material request to Logistics and coordinate with ASP for installation schedule and all issues pertaining to the project deployment.
• Make material list for RBS, Power System, Mini Link TN equipment, and Antenna system.
• Escalate/Monitoring & feedback to Regional Project Manager rollout of different civil issues popup during the TI.
• Coordinate with Supervisors for progress update of his sites.
• Escalate any issue or concern to Regional Project Manager which needs coordination with ASP management.

Background and Experience

 
Education Level: Bachelor's Degree
School Name: Feati University
Major: BSECE
City: Manila
Country: Philippines
Graduation Date: 12/04/1989
Description:  Republic Broadcasting Corp.
Radio & TV Engineering Department
GMA Building EDSA, June 1984
 Telemobile Trunking Radio
Philippine Telephone & Telegraph Company
PT&T Building, Aug. 1992
 Radiolab VT-100 & VT-200
ERG Electronics Limited
Easycall Building, May 1993
 Terrestrial Microwave and Heliax System Planning.
Andrew Corporation
Shangrila EDSA, March 1994
 GSM/DCS Mobile Radio Repair and Service Strategy
Hewlett Packard
Shangrila Makati, June 1994

Languages

Language Level
English Fluent

Job Preferences

Job Category: Ericsson Jobs
Job Type: Contract Job
Job Status: Immediate
Desired Salary: $0 a month
Desired Location: Asia
Willing to Relocate: Yes


URL of this page: http://www.3gwirelessjobs.com/web/resume/printpreview/34057
print page